York Single Package Cooling Unit ZD-A6C00A2A1AAA1A1

Need answers fast?
Explore the manual using AI.

York Single Package Cooling Unit ZD-A6C00A2A1AAA1A1
York Single Package Cooling Unit ZD-A6C00A2A1AAA1A1

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for York Single Package Cooling Unit ZD-A6C00A2A1AAA1A1

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

York Single Package Cooling Unit ZD-A6C00A2A1AAA1A1

York Single Package Cooling Unit ZD-A6C00A2A1AAA1A1

Create an account to install this asset package.

Maintenance Plans for York Single Package Cooling Unit Model ZD-A6C00A2A1AAA1A1

Integrate maintenance plans directly into your work orders in MaintainX.

Gas Piping Cleaning

Check mark

WARNING!

Check mark

Pipe Assembly

Check mark

Use special pipe dope for assembling pipes

Check mark

Pipe Cleaning

Check mark

Clean piping of dirt and scale by hammering on the outside of the pipe

Check mark

Blow out loose particles from the pipe

Check mark

Initial Start-up

Check mark

Ensure all gas lines external to the unit have been purged of air

Run this procedureArrow right

Joints Leaks Check

Check mark

WARNING!

Check mark

Gas Connection and Leak Test

Check mark

Open the main shut-off valve to admit normal gas pressure to the mains.

Check mark

Check all joints for leaks using a soap solution or other suitable material.

Check mark

Was a commercially available soap solution used for leak detection?

Check mark

WARNING!

Run this procedureArrow right

Initial 24 Hours Belt Tension Check

Check mark

Belt Tension Adjustment

Check mark

Loosen six nuts (top and bottom) A

Check mark

Adjust by turning (B)

Check mark

Ensure nuts (C) are not loosened

Check mark

Measure deflection distance using belt tension checker

Check mark

Determine deflection distance from normal position

Check mark

Check belt tension

Check mark

Re-tighten nuts (A) after adjusting

Check mark

Deflection Force Verification

Run this procedureArrow right

Filter Cleaning

Check mark

Filter Inspection and Cleaning

Check mark

Check that all filters are in place and clean

Check mark

Are the filters clean and in good condition?

Check mark

Inspect evaporator coil for any signs of frost or dirt accumulation

Check mark

Filter Replacement

Check mark

Do the filters need replacement?

Check mark

Replace filters with the same size and type

Check mark

Unit Operation Check

Check mark

Ensure filters are properly installed before operating the unit

Run this procedureArrow right

Initial Equipment Inspection

Check mark

Visual Inspection

Check mark

Inspect the unit for possible damage during transit.

Check mark

Note the extent of any damage on the carrier’s freight bill.

Check mark

Carrier Inspection Request

Check mark

Request inspection by the carrier’s agent in writing.

Check mark

Installation Compliance

Check mark

Ensure installation complies with enclosed instructions and applicable codes.

Check mark

Gas Supply System Testing

Check mark

Is the furnace disconnected from the gas supply piping system?

Run this procedureArrow right

Parts for York Single Package Cooling Unit ZD-A6C00A2A1AAA1A1

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

LP Gas Accessory Kit

1NP0440

Ducted Systems Accessory Kit

1GP0401

Optional CO2 Space Sensor Kit

2AQ04700524

Optional CO2 Sensor Kit

2AQ04700624

Mobile Access Portal (MAP) Gateway (Portable) Source 1

S1-JC-MAP1810-OP

LP Gas Accessory Kit

1NP0440

Ducted Systems Accessory Kit

1GP0401

Optional CO2 Space Sensor Kit

2AQ04700524

Optional CO2 Sensor Kit

2AQ04700624

Mobile Access Portal (MAP) Gateway (Portable) Source 1

S1-JC-MAP1810-OP

LP Gas Accessory Kit

1NP0440

Ducted Systems Accessory Kit

1GP0401

Optional CO2 Space Sensor Kit

2AQ04700524

Optional CO2 Sensor Kit

2AQ04700624

Mobile Access Portal (MAP) Gateway (Portable) Source 1

S1-JC-MAP1810-OP

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from York

Explore Other Assets