MaintainX, an Autodesk company
EnterprisePricing
York

York Single Package Cooling Unit ZD-03J00A2A1AAA1A1

Need answers fast?
Explore the manual using AI.

York Single Package Cooling Unit ZD-03J00A2A1AAA1A1
York Single Package Cooling Unit ZD-03J00A2A1AAA1A1

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for York Single Package Cooling Unit ZD-03J00A2A1AAA1A1

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

York Single Package Cooling Unit ZD-03J00A2A1AAA1A1

York Single Package Cooling Unit ZD-03J00A2A1AAA1A1

Create an account to install this asset package.

Maintenance Plans for York Single Package Cooling Unit Model ZD-03J00A2A1AAA1A1

Integrate maintenance plans directly into your work orders in MaintainX.

Gas Piping Cleaning

Check mark

WARNING!

Check mark

Pipe Assembly

Check mark

Use special pipe dope for assembly

Check mark

Pipe Cleaning

Check mark

Clean piping of dirt and scale by hammering on the outside of the pipe

Check mark

Blow out loose particles from the pipe

Check mark

Initial Start-up Preparation

Check mark

Ensure all gas lines external to the unit have been purged of air

Run this procedureArrow right

Manifold Gas Pressure Maintenance

Check mark

Adjustment of Gas Flow

Check mark

Remove the adjustment screw cap(s) on the regulator

Check mark

Adjust the gas pressure

Check mark

Replace adjustment screw caps

Check mark

Enter the current manifold pressure reading

Check mark

Is the manifold pressure set to the factory standard of 3.50 IWG?

Check mark

Describe any deviations from the expected manifold pressure

Run this procedureArrow right

Initial 24 Hours Belt Tension Check

Check mark

Belt Tension Adjustment

Check mark

Loosen six nuts (top and bottom) A

Check mark

Adjust by turning (B)

Check mark

Ensure nuts (C) are not loosened

Check mark

Measure deflection distance using belt tension checker

Check mark

Enter the deflection force applied

Check mark

Is the deflection force within the recommended range?

Check mark

Re-tighten nuts (A) after adjustment

Check mark

Belt Tension Verification

Run this procedureArrow right

Blower Rotation Check

Check mark

Initial Inspection

Check mark

Verify that the ZE units are properly phased at the factory.

Check mark

Is the blower rotating in the correct direction?

Check mark

Compressor Rotation Check

Check mark

Is the compressor rotating in the correct direction?

Check mark

Measure the amperage of the scroll compressor.

Check mark

Are the suction and discharge pressures similar?

Check mark

Is the scroll compressor producing a high noise level?

Check mark

Phasing Correction

Run this procedureArrow right

Filter Cleaning

Check mark

Filter Inspection and Cleaning

Check mark

Check that all filters are in place and clean

Check mark

Are the filters clean and in good condition?

Check mark

Clean or replace filters if necessary

Check mark

Evaporator Coil Check

Check mark

Are the filters installed ahead of the evaporator coil?

Check mark

Inspect evaporator coil for frost or damage

Check mark

Unit Operation Check

Check mark

Is the unit operating with filters properly installed?

Run this procedureArrow right

Parts for York Single Package Cooling Unit ZD-03J00A2A1AAA1A1

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

LP Gas Accessory Kit

1NP0440

Ducted Systems Accessory Kit

1GP0401

Optional CO2 Space Sensor Kit

2AQ04700524

Optional CO2 Sensor Kit

2AQ04700624

Mobile Access Portal (MAP) Gateway (Portable) Source 1

S1-JC-MAP1810-OP

LP Gas Accessory Kit

1NP0440

Ducted Systems Accessory Kit

1GP0401

Optional CO2 Space Sensor Kit

2AQ04700524

Optional CO2 Sensor Kit

2AQ04700624

Mobile Access Portal (MAP) Gateway (Portable) Source 1

S1-JC-MAP1810-OP

LP Gas Accessory Kit

1NP0440

Ducted Systems Accessory Kit

1GP0401

Optional CO2 Space Sensor Kit

2AQ04700524

Optional CO2 Sensor Kit

2AQ04700624

Mobile Access Portal (MAP) Gateway (Portable) Source 1

S1-JC-MAP1810-OP

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from York

Explore Other Assets