

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

York Single Package Cooling Unit ZD-03H00A2A1AAA1A1
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Manifold Gas Pressure Maintenance
Adjustment of Gas Flow
Remove the adjustment screw cap(s) on the regulator
Adjust the gas pressure
Replace adjustment screw caps
Enter the current manifold pressure reading
Is the manifold pressure set to the factory standard of 3.50 IWG?
Note any deviations from the expected manifold pressure
Gas Piping Cleaning
WARNING!
Pipe Assembly
Use special pipe dope for assembling pipes
Pipe Cleaning
Clean piping of dirt and scale by hammering on the outside of the pipe
Blow out loose particles from the pipe
Initial Start-up Preparation
Ensure all gas lines external to the unit have been purged of air
Burner Replacement
Preparation
Close main manual shut-off valve
Shut off all electric power to the unit
Burner Removal
Remove screws holding manifold to burner supports
Open union fitting in gas supply line upstream of unit gas valve
Remove gas piping closure panel
Disconnect wiring to gas valves and spark ignitors
Remove manifold-burner gas valve assembly by lifting up and pulling back
Joints Leaks Check
WARNING!
Gas Connection and Leak Check
Open the main shut-off valve to admit normal gas pressure to the mains.
Check all joints for leaks using a soap solution or other suitable material.
WARNING!
Initial Equipment Inspection
Visual Inspection
Inspect the unit for possible damage during transit
Note the extent of any damage on the carrier’s freight bill
Request inspection by the carrier’s agent in writing
Installation Compliance
Ensure installation instructions are followed
Gas Supply System Testing
Is the furnace disconnected from the gas supply piping system?
Is the gas valve replaced if subjected to pressure greater than 1/2 PSIG?
Access the parts list for your equipment in MaintainX.
LP Gas Accessory Kit
1NP0440
Ducted Systems Accessory Kit
1GP0401
Optional CO2 Space Sensor Kit
2AQ04700524
Optional CO2 Sensor Kit
2AQ04700624
Mobile Access Portal (MAP) Gateway (Portable) Source 1
S1-JC-MAP1810-OP
LP Gas Accessory Kit
1NP0440
Ducted Systems Accessory Kit
1GP0401
Optional CO2 Space Sensor Kit
2AQ04700524
Optional CO2 Sensor Kit
2AQ04700624
Mobile Access Portal (MAP) Gateway (Portable) Source 1
S1-JC-MAP1810-OP
LP Gas Accessory Kit
1NP0440
Ducted Systems Accessory Kit
1GP0401
Optional CO2 Space Sensor Kit
2AQ04700524
Optional CO2 Sensor Kit
2AQ04700624
Mobile Access Portal (MAP) Gateway (Portable) Source 1
S1-JC-MAP1810-OP
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













