

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Viking Pump HL124A
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Pump Cleaning
Safety Information
Read and understand the safety information before proceeding
Ensure pump is turned off and disconnected from power source
Inspect the pump for any visible damage
Clean the exterior of the pump
Check that all grease fittings are clean and accessible
Inspect and clean the pump's internal components
Remove the pump casing
Clean the impeller and volute
Carbon Graphite Bushing Installation
Preparation
Ensure all necessary tools and materials are available, including lubricant and press.
Add a chamfer on the bushing and the mating part.
Installation with Press
Use a press for installation.
Ensure the bushing is started straight.
Do not stop pressing operation until bushing is in proper position.
Post-Installation Check
Check bushing for cracks after installation.
Pressure Relief Valve Pressure Adjustment
Safety Precautions
Ensure pressure in the chamber is completely vented through appropriate openings or connections.
Ensure the driving means is locked out or made non-operational.
Identify the liquid the pump has been handling and understand necessary safety precautions.
Obtain and review the material safety data sheet (MSDS) for the liquid.
Pressure Adjustment Procedure
Carefully remove valve cap and loosen locknut on adjusting screw.
Install a pressure gauge in the discharge line.
Adjust the pressure setting by turning the adjusting screw.
500 Hourly / 6 Monthly Pump Lubrication
Safety Information
Improper installation, operation or maintenance of pump may cause serious injury or death, and/or result in damage to pump and/or other equipment. Viking’s warranty does not cover failure due to improper installation, operation or maintenance.
Lubricate all fittings
Apply external lubrication slowly with a hand gun to all lubrication fittings every 500 hours of operation with multi-purpose grease, NLGI # 2.
Contact your Viking Pump® representative with specific lubrication questions.
Check compatibility of grease
Refer to Engineering Service Bulletin ESB-515 in the Appendix for standard grease thickener types used by Viking to check compatibility.
Ensure compatibility of lubricating fluid with process fluid for O-Pro™ seals.
Temperature considerations
Packing Adjustment
SAFETY INFORMATION!
Acknowledge understanding of safety information
Initial Packing Adjustment
Make initial packing adjustments carefully
Is the packing gland adjusted correctly?
Inspection and Adjustment
Inspect for need of packing gland adjustment or replacement
Contact Viking Pump® representative if needed
Ongoing Maintenance
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













