MaintainX, an Autodesk company
EnterprisePricing
Viking

Viking Pump G124A

Need answers fast?
Explore the manual using AI.

Viking Pump G124A
Viking Pump G124A

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Viking Pump G124A

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Viking Pump G124A

Viking Pump G124A

Create an account to install this asset package.

Maintenance Plans for Viking Pump Model G124A

Integrate maintenance plans directly into your work orders in MaintainX.

Pump Cleaning

Check mark

SAFETY INFORMATION!

Check mark

Acknowledge understanding of safety information

Check mark

Pre-Cleaning Inspection

Check mark

Ensure the following safety measures are in place

Check mark

Cleaning Process

Check mark

Remove any visible dirt and debris from the pump exterior

Check mark

Clean grease fittings to ensure they are not dirt covered

Check mark

Post-Cleaning Inspection

Check mark

Inspect pump for any signs of damage or wear

Run this procedureArrow right

Carbon Graphite Bushing Installation

Check mark

Preparation

Check mark

Ensure all necessary tools and materials are available, including lubricant and press.

Check mark

Add a chamfer on the bushing and the mating part.

Check mark

Installation of Carbon Graphite Bushings

Check mark

Use a press for installation.

Check mark

Ensure the bushing is started straight.

Check mark

Do not stop pressing operation until bushing is in proper position.

Check mark

Check bushing for cracks after installation.

Check mark

Installation of High Temperature Bushings

Run this procedureArrow right

500 Hourly / 6 Monthly Pump Lubrication

Check mark

SAFETY INFORMATION!

Check mark

Acknowledge understanding of safety information

Check mark

Lubrication Procedure

Check mark

Apply external lubrication slowly with a hand gun to all lubrication fittings

Check mark

Contact Viking Pump® representative for specific lubrication questions

Check mark

Check Engineering Service Bulletin ESB-515 for grease compatibility

Check mark

Are there applications involving very high or low temperatures?

Check mark

Grease O-Pro™ seals with a compatible lubricating fluid

Run this procedureArrow right

Packing Removal and Installation

Check mark

Safety Precautions

Check mark

Ensure pressure in the chamber is completely vented

Check mark

Lock out or make non-operational the driving means

Check mark

Identify the liquid the pump has been handling and obtain MSDS

Check mark

Removal: Packing

Check mark

Insert brass or plastic bar through port opening between rotor teeth

Check mark

Bend up tang of lockwasher and remove locknut and lockwasher from shaft

Check mark

Remove brass or plastic bar from port opening

Check mark

Loosen setscrews in the face of the bearing housing

Run this procedureArrow right

End Clearance Adjustment

Check mark

Safety Precautions

Check mark

Ensure pressure in the chamber is completely vented

Check mark

Lock out or make non-operational the driving means

Check mark

Identify the liquid the pump has been handling

Check mark

Obtain and understand the material safety data sheet (MSDS) for the liquid

Check mark

End Clearance Adjustment

Check mark

Refer to TSM for procedure on adjusting end clearance for the specific pump model

Check mark

Adjust the end clearance between the rotor teeth and the head

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Viking

Explore Other Assets