

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Viking Pump G124A
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Pump Cleaning
SAFETY INFORMATION!
Acknowledge understanding of safety information
Pre-Cleaning Inspection
Ensure the following safety measures are in place
Cleaning Process
Remove any visible dirt and debris from the pump exterior
Clean grease fittings to ensure they are not dirt covered
Post-Cleaning Inspection
Inspect pump for any signs of damage or wear
Carbon Graphite Bushing Installation
Preparation
Ensure all necessary tools and materials are available, including lubricant and press.
Add a chamfer on the bushing and the mating part.
Installation of Carbon Graphite Bushings
Use a press for installation.
Ensure the bushing is started straight.
Do not stop pressing operation until bushing is in proper position.
Check bushing for cracks after installation.
Installation of High Temperature Bushings
500 Hourly / 6 Monthly Pump Lubrication
SAFETY INFORMATION!
Acknowledge understanding of safety information
Lubrication Procedure
Apply external lubrication slowly with a hand gun to all lubrication fittings
Contact Viking Pump® representative for specific lubrication questions
Check Engineering Service Bulletin ESB-515 for grease compatibility
Are there applications involving very high or low temperatures?
Grease O-Pro™ seals with a compatible lubricating fluid
Packing Removal and Installation
Safety Precautions
Ensure pressure in the chamber is completely vented
Lock out or make non-operational the driving means
Identify the liquid the pump has been handling and obtain MSDS
Removal: Packing
Insert brass or plastic bar through port opening between rotor teeth
Bend up tang of lockwasher and remove locknut and lockwasher from shaft
Remove brass or plastic bar from port opening
Loosen setscrews in the face of the bearing housing
End Clearance Adjustment
Safety Precautions
Ensure pressure in the chamber is completely vented
Lock out or make non-operational the driving means
Identify the liquid the pump has been handling
Obtain and understand the material safety data sheet (MSDS) for the liquid
End Clearance Adjustment
Refer to TSM for procedure on adjusting end clearance for the specific pump model
Adjust the end clearance between the rotor teeth and the head
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













