MaintainX Asset Hub logo
EnterprisePricing
Telsmith

Telsmith Vibrating Aggregate Screen 5 x 14 Double Deck

Need answers fast?
Explore the manual using AI.

Telsmith Vibrating Aggregate Screen 5 x 14 Double Deck
Telsmith Vibrating Aggregate Screen 5 x 14 Double Deck

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Telsmith Vibrating Aggregate Screen 5 x 14 Double Deck

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Telsmith Vibrating Aggregate Screen 5 x 14 Double Deck

Telsmith Vibrating Aggregate Screen 5 x 14 Double Deck

Create an account to install this asset package.

Maintenance Plans for Telsmith Vibrating Aggregate Screen Model 5 x 14 Double Deck

Integrate maintenance plans directly into your work orders in MaintainX.

Initial 8 Hours Vibrating Aggregate Screen Check

Check mark

Pre-Start-Up Checks

Check mark

Check oil level in each gauge before starting the screen

Check mark

Is the gear oil level adequate before start-up?

Check mark

Post 8 Hours Operation Checks

Check mark

Check oil level in each gauge after 8 hours of operation

Check mark

Is the gear oil level adequate after 8 hours of operation?

Check mark

Labyrinth Seal Greasing

Check mark

Is grease visible at the seal plate/vibrating shaft junction?

Check mark

Is excessive grease evident or being flung on the counterweights?

Run this procedureArrow right

Vibrating Aggregate Screen Cross Brace Replacement

Check mark

Preparation

Check mark

Review Figure 8-55 for brace pattern

Check mark

Identify brace lengths to be replaced

Check mark

Brace Removal

Check mark

Clamp the brace being removed to the mounting tabs at both ends using a C-clamp

Check mark

Hold the hex nuts from below

Check mark

Remove all 3/4” capscrews holding the brace to the support frame

Check mark

Support the cross brace

Check mark

Remove the C-clamps from one end at a time while lowering the brace

Run this procedureArrow right

Vibrating Aggregate Screen Oil Temperature Check

Check mark

Initial Inspection

Check mark

Check for signs of oil breakdown

Check mark

Temperature Measurement

Check mark

Measure temperature on the bearing housing face using a magnetic thermometer

Check mark

Measure temperature on the bearing housing rim using a magnetic thermometer

Check mark

Check for hot spots using a hand held digital heat scanning device

Check mark

Temperature Evaluation

Check mark

Is any bearing cover showing more than 180°F (82°C)?

Check mark

Overtemperature Investigation

Run this procedureArrow right

1 Daily Vibrating Aggregate Screen Check

Check mark

Wire Cloth Screen Inspection

Check mark

Check wire weave for breaks, tears or separation of the wire.

Check mark

Replace wire that exhibits any damage.

Check mark

Operating Screen Observation

Check mark

Observe operating screen for any panels with 'dead spots' where material is puddling.

Check mark

Replace wire panels that no longer maintain tension over the complete surface area.

Check mark

Screen Tension and Buffer Check

Check mark

Check that screen is tight against all buffer and crown bars.

Check mark

Replace rubber if missing, torn or worn through to the metal on crown bars.

Run this procedureArrow right

500 Hourly Vibrating Aggregate Screen Oil Change

Check mark

Oil Drainage

Check mark

Remove the drain plug from both manifolds and drain oil into a container large enough to contain approximately 8 gallons of oil.

Check mark

Elevate one side of the screen to facilitate drainage if necessary.

Check mark

Oil Refill

Check mark

Install drain plugs.

Check mark

Refill system with 7 gallons (26 L) of specified gear oil for your operating conditions.

Check mark

Dispose of used oil and flushing solvents according to all Federal, State and Local regulations.

Check mark

Post-Refill Check

Check mark

Run screen for 30 minutes.

Run this procedureArrow right

Parts for Telsmith Vibrating Aggregate Screen 5 x 14 Double Deck

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Drive Guard - Back

1045975

Drive Guard Mount - Lower

1045979

Drive Guard Mount - Upper

1045978

Drive Guard - Front Cover Yellow

1045976

Drive Guard - Front Cover Yellow

1045977

Drive Guard - Back

1045975

Drive Guard Mount - Lower

1045979

Drive Guard Mount - Upper

1045978

Drive Guard - Front Cover Yellow

1045976

Drive Guard - Front Cover Yellow

1045977

Drive Guard - Back

1045975

Drive Guard Mount - Lower

1045979

Drive Guard Mount - Upper

1045978

Drive Guard - Front Cover Yellow

1045976

Drive Guard - Front Cover Yellow

1045977

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Telsmith

Explore Other Assets