MaintainX Asset Hub logo
EnterprisePricing
Telsmith

Telsmith Vibrating Aggregate Screen 5 x 14 Single Deck

Need answers fast?
Explore the manual using AI.

Telsmith Vibrating Aggregate Screen 5 x 14 Single Deck
Telsmith Vibrating Aggregate Screen 5 x 14 Single Deck

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Telsmith Vibrating Aggregate Screen 5 x 14 Single Deck

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Telsmith Vibrating Aggregate Screen 5 x 14 Single Deck

Telsmith Vibrating Aggregate Screen 5 x 14 Single Deck

Create an account to install this asset package.

Maintenance Plans for Telsmith Vibrating Aggregate Screen Model 5 x 14 Single Deck

Integrate maintenance plans directly into your work orders in MaintainX.

500 Hourly Vibrating Aggregate Screen Oil Change

Check mark

Oil Drainage

Check mark

Remove the drain plug from both manifolds and drain oil into a container large enough to contain approximately 8 gallons of oil.

Check mark

Elevate one side of the screen to facilitate drainage if necessary.

Check mark

Oil Refill

Check mark

Install drain plugs.

Check mark

Refill system with 7 gallons (26 L) of specified gear oil for your operating conditions.

Check mark

Dispose of used oil and flushing solvents according to all Federal, State and Local regulations.

Check mark

Post-Refill Check

Check mark

Run screen for 30 minutes.

Run this procedureArrow right

Initial 8 Hours Vibrating Aggregate Screen Check

Check mark

Pre-Start-Up Checks

Check mark

Check oil level in each oil manifold sight gauge before starting the screen

Check mark

Is the oil level adequate in each gauge before starting the screen?

Check mark

Post 8 Hours Operation Checks

Check mark

Check oil level in each oil manifold sight gauge after 8 hours of operation

Check mark

Is the oil level adequate in each gauge after 8 hours of operation?

Check mark

Labyrinth Seal Greasing

Check mark

Is grease visible at the seal plate/vibrating shaft junction behind the counterweight?

Check mark

Wipe off excess grease if excessive grease is evident or being flung on the counterweights

Run this procedureArrow right

1 Weekly Vibrating Aggregate Screen Maintenance

Check mark

Vibrator and Sheave Inspection

Check mark

Check vibrator oil for impurities (oil sample)

Check mark

Check nuts and bolts for tightness or missing fasteners

Check mark

Check that vibrating unit drive sheave is free of debris and tight on shaft bushing

Check mark

Check that electric drive motor output sheave is tight on shaft

Check mark

Component Inspection and Replacement

Check mark

Inspect friction pucks. Replace if surface is worn below usable dimension

Check mark

Check live frame for cracks or broken welds

Check mark

Check that support structure is level from side to side

Run this procedureArrow right

Vibrating Aggregate Screen Oil Temperature Check

Check mark

Initial Inspection

Check mark

Check for signs of oil breakdown

Check mark

Temperature Measurement

Check mark

Measure temperature on the bearing housing face using a magnetic thermometer

Check mark

Measure temperature on the bearing housing rim using a magnetic thermometer

Check mark

Check for hot spots using a hand held digital heat scanning device

Check mark

Temperature Evaluation

Check mark

Is the temperature above 180°F (82°C) at any point?

Check mark

Determine Cause of Overtemperature

Run this procedureArrow right

HD Panel Support Frame Replacement

Check mark

Preparation and Safety

Check mark

Ensure cross bracing is provided if all support frames and drive units are removed.

Check mark

Removal of Backplate and Discharge Lip

Check mark

Support the backplate with a hoist and lift straps.

Check mark

Remove the capscrews holding the backplate to the support frame.

Check mark

Lower the backplate to the ground.

Check mark

Support the discharge lip with straps and a hoist.

Check mark

Remove the six capscrews and locknuts holding the discharge lip assembly.

Check mark

Lower the discharge lip assembly to the ground.

Run this procedureArrow right

Parts for Telsmith Vibrating Aggregate Screen 5 x 14 Single Deck

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Drive Guard - Back

1045975

Drive Guard Mount - Lower

1045979

Drive Guard Mount - Upper

1045978

Drive Guard - Front Cover Yellow

1045976

Drive Guard - Front Cover Yellow

1045977

Drive Guard - Back

1045975

Drive Guard Mount - Lower

1045979

Drive Guard Mount - Upper

1045978

Drive Guard - Front Cover Yellow

1045976

Drive Guard - Front Cover Yellow

1045977

Drive Guard - Back

1045975

Drive Guard Mount - Lower

1045979

Drive Guard Mount - Upper

1045978

Drive Guard - Front Cover Yellow

1045976

Drive Guard - Front Cover Yellow

1045977

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Telsmith

Explore Other Assets