MaintainX Asset Hub logo
EnterprisePricing
Telsmith

Telsmith Vibrating Aggregate Screen 4 x 10 Double Deck

Need answers fast?
Explore the manual using AI.

Telsmith Vibrating Aggregate Screen 4 x 10 Double Deck
Telsmith Vibrating Aggregate Screen 4 x 10 Double Deck

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Telsmith Vibrating Aggregate Screen 4 x 10 Double Deck

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Telsmith Vibrating Aggregate Screen 4 x 10 Double Deck

Telsmith Vibrating Aggregate Screen 4 x 10 Double Deck

Create an account to install this asset package.

Maintenance Plans for Telsmith Vibrating Aggregate Screen Model 4 x 10 Double Deck

Integrate maintenance plans directly into your work orders in MaintainX.

HD Panel Support Frame Replacement

Check mark

Preparation and Safety

Check mark

Ensure cross bracing is provided if all support frames and drive units are removed.

Check mark

Removal of Backplate and Discharge Lip

Check mark

Support the backplate with a hoist and lift straps.

Check mark

Remove the capscrews holding the backplate to the support frame.

Check mark

Lower the backplate to the ground.

Check mark

Support the discharge lip with straps and a hoist.

Check mark

Remove the six capscrews and locknuts holding the discharge lip assembly.

Check mark

Lower the discharge lip assembly to the ground.

Run this procedureArrow right

1500 Hourly / 6 Monthly Bearing Housing Breather Maintenance

Check mark

Breather Assembly Removal

Check mark

Remove the breather assembly from the top of the bearing housing by unthreading the complete assembly at the threaded bushing.

Check mark

Breather Cover Separation

Check mark

Separate the breather cover from the mounting bushing by unscrewing the cover from the bushing.

Check mark

Cleaning and Inspection

Check mark

Clean the breather assembly with solvent.

Check mark

Blow dry the breather assembly with compressed air.

Check mark

Were all blockages removed?

Check mark

Breather Replacement

Run this procedureArrow right

Initial 8 Hours Vibrating Aggregate Screen Check

Check mark

Gear Oil Level Check

Check mark

Check oil level in each gauge before starting the screen

Check mark

Check oil level in each gauge after the first 8 hours of operation

Check mark

Is the gear oil level adequate according to Table 6-1?

Check mark

Labyrinth Seals Inspection

Check mark

Have the labyrinth seals been run for 8 hours before adding more grease?

Check mark

Attempt to add more grease to the zerks after the initial break in shift

Check mark

Is grease visible at the seal plate/vibrating shaft junction?

Check mark

Is excessive grease evident or being flung on the counterweights?

Run this procedureArrow right

1 Daily Vibrating Aggregate Screen Maintenance

Check mark

Oil Level Check

Check mark

Check oil level at both sight gauges

Check mark

Is the oil level low?

Check mark

Add additional oil through the oil manifold breather pipe if needed

Check mark

Daily Start-Up

Check mark

Check oil level at petcocks on each side of vibrating unit

Check mark

Add oil as needed

Check mark

Inspect breathers for clogs and clean or replace if necessary

Check mark

Check for oil leakage at bearings, shaft seals, and casing plugs

Run this procedureArrow right

Vibrating Aggregate Screen Counterweight Shim Replacement

Check mark

Preparation

Check mark

Consult Telsmith Engineering Department before proceeding

Check mark

Shim Removal

Check mark

Remove the two hex head capscrews holding the counterweight shim stack

Check mark

Slide the shims out one at a time off the counterweight hub

Check mark

Shim Installation

Check mark

Slide additional shims on the counterweight hub if required

Check mark

Fasten shims in position with the two hex head capscrews

Check mark

Safety Check

Run this procedureArrow right

Parts for Telsmith Vibrating Aggregate Screen 4 x 10 Double Deck

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Drive Guard - Back

1045975

Drive Guard Mount - Lower

1045979

Drive Guard Mount - Upper

1045978

Drive Guard - Front Cover Yellow

1045976

Drive Guard - Front Cover Yellow

1045977

Drive Guard - Back

1045975

Drive Guard Mount - Lower

1045979

Drive Guard Mount - Upper

1045978

Drive Guard - Front Cover Yellow

1045976

Drive Guard - Front Cover Yellow

1045977

Drive Guard - Back

1045975

Drive Guard Mount - Lower

1045979

Drive Guard Mount - Upper

1045978

Drive Guard - Front Cover Yellow

1045976

Drive Guard - Front Cover Yellow

1045977

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Telsmith

Explore Other Assets