PDF MANUAL

Manual for Telsmith Vibrating Aggregate Screen 6 x 20 Single Deck

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Telsmith Vibrating Aggregate Screen 6 x 20 Single Deck

Telsmith Vibrating Aggregate Screen 6 x 20 Single Deck

Create an account to install this asset package.

Maintenance Plans for Telsmith Vibrating Aggregate Screen Model 6 x 20 Single Deck

Integrate maintenance plans directly into your work orders in MaintainX.

1500 Hourly / 6 Monthly Bearing Housing Breather Maintenance

Check mark

Breather Assembly Removal

Check mark

Remove the breather assembly from the top of the bearing housing by unthreading the complete assembly at the threaded bushing.

Check mark

Breather Assembly Cleaning

Check mark

Separate the breather cover from the mounting bushing by unscrewing the cover from the bushing.

Check mark

Clean the assembly with solvent.

Check mark

Blow dry the assembly with compressed air.

Check mark

Breather Replacement

Check mark

Were blockages removed successfully?

Check mark

Replace the breather with a new unit if blockages cannot be removed.

Run this procedureArrow right

1 Daily Vibrating Aggregate Screen Check

Check mark

Wire Cloth Screen Inspection

Check mark

Check wire weave for breaks, tears or separation of the wire.

Check mark

Replace wire that exhibits any damage.

Check mark

Operating Screen Observation

Check mark

Are there any panels with 'dead spots' where material is puddling?

Check mark

Replace wire panels that no longer maintain tension over the complete surface area.

Check mark

Screen Tension and Buffer Check

Check mark

Is the screen tight against all buffer and crown bars?

Check mark

Replace rubber if missing, torn or worn through to the metal on crown bars.

Run this procedureArrow right

Wire Support Frame Replacement

Check mark

Preparation

Check mark

Ensure cross bracing is provided if all support frames and drive unit/shaft casings are removed.

Check mark

Determine sequence of wire support frame removal based on screen model and drive unit/shaft casing status.

Check mark

Wire Support Frame Removal

Check mark

Remove all cross braces from the bottom side of the screen frame.

Check mark

Support the back plate with a hoist and lift straps, then remove and lower it.

Check mark

Support the discharge lip with straps and a hoist, then remove and lower it.

Check mark

Support the wire frame from above with lift straps at all four corners.

Check mark

Cut the huck bolts at the four corners and temporarily replace them with bolts, nuts, and washers.

Run this procedureArrow right

Vibrating Aggregate Screen Counterweight Shim Replacement

Check mark

Preparation

Check mark

Consult Telsmith Engineering Department before proceeding with shim changes

Check mark

Shim Removal

Check mark

Remove the two hex head capscrews holding the counterweight shim stack

Check mark

Slide the shims out one at a time off the counterweight hub

Check mark

Shim Installation

Check mark

Slide additional shims on the counterweight hub if required

Check mark

Fasten shims in position with the two hex head capscrews

Check mark

Safety Check

Run this procedureArrow right

1 Weekly Vibrating Aggregate Screen Maintenance

Check mark

Vibrator and Sheave Inspection

Check mark

Check vibrator oil for impurities (oil sample)

Check mark

Check nuts and bolts for tightness or missing fasteners

Check mark

Check decks for heavily worn hardware or worn cross members

Check mark

Check that vibrating unit drive sheave is free of debris and tight on shaft bushing

Check mark

Check that electric drive motor output sheave is tight on shaft

Check mark

Component Inspection and Replacement

Check mark

Inspect friction pucks. Replace if surface is worn below usable dimension

Check mark

Check live frame for cracks or broken welds

Run this procedureArrow right

Parts for Telsmith Vibrating Aggregate Screen 6 x 20 Single Deck

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Drive Guard - Back

1045975

Drive Guard Mount - Lower

1045979

Drive Guard Mount - Upper

1045978

Drive Guard - Front Cover Yellow

1045976

Drive Guard - Front Cover Yellow

1045977

Drive Guard - Back

1045975

Drive Guard Mount - Lower

1045979

Drive Guard Mount - Upper

1045978

Drive Guard - Front Cover Yellow

1045976

Drive Guard - Front Cover Yellow

1045977

Drive Guard - Back

1045975

Drive Guard Mount - Lower

1045979

Drive Guard Mount - Upper

1045978

Drive Guard - Front Cover Yellow

1045976

Drive Guard - Front Cover Yellow

1045977

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Telsmith

Explore Other Assets