Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Stoelting Foodservice Equipment Ice Cream Machine F131-38I2-WF
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
3 Monthly Ice Cream Machine Drive Belt Check
Safety Precautions
Disconnect the machine from electrical supply
Ensure the machine is powered off before servicing
Drive Belt Inspection
Check drive belts for wear
Tighten drive belts if necessary
Service Completion
Confirm service was completed by a qualified electrician/refrigeration specialist
Ice Cream Machine Front Door Assembling
Preparation
Ensure all necessary parts are available
Lubrication
Apply sanitary lubricant to o-rings on spigot bodies
Front Door Assembly
Install o-rings onto the spigot bodies and insert through the bottom of the front door
Fit the front door o-rings into the grooves on the rear of the front door
Place the front door assembly on the mounting studs and push against the machine
Secure the front door by placing knobs on the studs and tighten until finger tight
Ice Cream Machine Motor Calibration
Ensure sanitizer is in the freezing cylinders
Press the On/Off Left or On/Off Right button to display the Motor Calibration screen
Select both sides for calibration
Brush the hopper sides and cover with a clean sanitized brush
Record the calibration information in the startup form
Press the left arrow button after recording the information
Drain the machine of sanitizer
Ice Cream Machine Auger Disassembling
Initial Disassembly
Remove the front auger support and bushing
Remove the auger assembly from the machine
Pull the auger out of the freezing cylinder slowly
Plastic Flights and Springs Removal
Carefully remove each of the plastic flights with springs as the auger is being pulled out
Rear Seal Assembly Handling
Keep the rear of the auger tipped up once it is clear of the freezing cylinder to prevent the rear seal assembly from dropping
Wipe the lubricant off of the hex end of the auger with a paper towel
Ice Cream Machine Auger Assembling
Preparation
Ensure all parts are available
Assembly of Auger
Screw the springs onto the studs in the plastic flights completely
Install the two plastic flights onto the rear of the auger and insert it part way into the freezing cylinder
Install the remaining plastic flights, push the auger into the freezing cylinder and rotate slowly until the auger engages the drive shaft
Lubrication and Final Assembly
Apply a thin layer of sanitary lubricant to the inside and outside of the auger support bushing
Install the bushing onto the auger support and install the auger support into the front of the auger
Access the parts list for your equipment in MaintainX.
Brush, 4" X 8" X 16" Barrel
208135
Brush, 1/4" X 3" X 14"
208380
Brush, 1" X 3" X 10"
208401
Brush, 3/8" X 1" X 5"
208467
Cap, Rosette 6-Point Teardrop, Translucent
232741
Brush, 4" X 8" X 16" Barrel
208135
Brush, 1/4" X 3" X 14"
208380
Brush, 1" X 3" X 10"
208401
Brush, 3/8" X 1" X 5"
208467
Cap, Rosette 6-Point Teardrop, Translucent
232741
Brush, 4" X 8" X 16" Barrel
208135
Brush, 1/4" X 3" X 14"
208380
Brush, 1" X 3" X 10"
208401
Brush, 3/8" X 1" X 5"
208467
Cap, Rosette 6-Point Teardrop, Translucent
232741
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













