MaintainX Asset Hub logo
EnterprisePricing
Stoelting Foodservice Equipment

Stoelting Foodservice Equipment Ice Cream Machine E131-38I2

Need answers fast?
Explore the manual using AI.

Stoelting Foodservice Equipment Ice Cream Machine E131-38I2
Stoelting Foodservice Equipment Ice Cream Machine E131-38I2

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Stoelting Foodservice Equipment Ice Cream Machine E131-38I2

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Stoelting Foodservice Equipment Ice Cream Machine E131-38I2

Stoelting Foodservice Equipment Ice Cream Machine E131-38I2

Create an account to install this asset package.

Maintenance Plans for Stoelting Foodservice Equipment Ice Cream Machine Model E131-38I2

Integrate maintenance plans directly into your work orders in MaintainX.

Ice Cream Machine Motor Calibration

Check mark

Ensure sanitizer is in the freezing cylinders

Check mark

Press the On/Off Left or On/Off Right button to display the Motor Calibration screen

Check mark

Select both sides for calibration

Check mark

Move the cursor over the Left side and press the SEL button

Check mark

Move the cursor over the Right side and press the SEL button

Check mark

Brush the hopper sides and cover with a clean sanitized brush

Check mark

Record the calibration information in the startup form

Check mark

Press the left arrow button after recording the information

Check mark

Drain the machine of sanitizer

Run this procedureArrow right

1 Monthly Condenser Filter Check

Check mark

Safety Warning

Check mark

Ensure the machine is disconnected from electrical supply before servicing.

Check mark

Verify that the power is disconnected.

Check mark

Condenser Filter Inspection

Check mark

Check the condenser filter for dirt.

Check mark

Clean the condenser filter if necessary.

Check mark

Service Completion

Check mark

Ensure service is completed by a qualified electrician/refrigeration specialist.

Check mark

Confirm no damage to the machine post-service.

Run this procedureArrow right

1 Daily Ice Cream Machine Check

Check mark

WARNING: Hazardous voltage. The machine must be disconnected from electrical supply before servicing.

Check mark

Disconnect the machine from electrical supply before servicing

Check mark

Check for worn or broken parts and replace parts as necessary

Check mark

Describe any unusual noise or condition observed

Check mark

Was immediate repair needed for any unusual noise or condition?

Check mark

WARNING: Service must be completed by a qualified electrician/refrigeration specialist.

Check mark

Record the name of the qualified electrician/refrigeration specialist who performed the service

Run this procedureArrow right

Ice Cream Machine Rear Seal Assembling

Check mark

Preparation

Check mark

Ensure all necessary parts and tools are available

Check mark

Lubrication and Installation

Check mark

Install the rear seal o-ring onto the auger.

Check mark

Lubricate the outside of the o-ring with a generous amount of Total Blend lubricant.

Check mark

Lubricate the inside metal surface of the rear seal and install it onto the auger shaft.

Check mark

Ensure the outside of the rear auger seal is not lubricated.

Check mark

Lubricate the hex drive end of the auger with a small amount of Total Blend lubricant.

Check mark

Compliance Check

Run this procedureArrow right

Ice Cream Machine Cleaning

Check mark

Disassembly and Cleaning

Check mark

Disassemble all parts (Refer to Section 3.4 for the disassembly of machine parts)

Check mark

Place all parts in 90° to 110°F (32°C to 43°C) mild detergent water and wash thoroughly

Check mark

Use brushes to clean all holes in the front door, flights, mix pickup assembly, etc.

Check mark

Rinsing and Sanitizing

Check mark

Rinse all parts with clean 90° to 110°F (32°C to 43°C) water

Check mark

Place all parts in a sanitizing solution for at least 1 minute

Check mark

Let all parts air dry completely before assembling in machine

Check mark

Sanitizing the Machine

Run this procedureArrow right

Parts for Stoelting Foodservice Equipment Ice Cream Machine E131-38I2

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Brush, 4" X 8" X 16" Barrel

208135

Brush, 1/4" X 3" X 14"

208380

Brush, 1" X 3" X 10"

208401

Brush, 3/8" X 1" X 5"

208467

Cap, Rosette 6-Point Teardrop, Translucent

232741

Brush, 4" X 8" X 16" Barrel

208135

Brush, 1/4" X 3" X 14"

208380

Brush, 1" X 3" X 10"

208401

Brush, 3/8" X 1" X 5"

208467

Cap, Rosette 6-Point Teardrop, Translucent

232741

Brush, 4" X 8" X 16" Barrel

208135

Brush, 1/4" X 3" X 14"

208380

Brush, 1" X 3" X 10"

208401

Brush, 3/8" X 1" X 5"

208467

Cap, Rosette 6-Point Teardrop, Translucent

232741

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Stoelting Foodservice Equipment

Explore Other Assets