Manual for Pompetravaini Centrifugal Pump MILLS

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Pompetravaini Centrifugal Pump MILLS

Pompetravaini Centrifugal Pump MILLS

Create an account to install this asset package.

Maintenance Plans for Pompetravaini Centrifugal Pump Model MILLS

Integrate maintenance plans directly into your work orders in MaintainX.

Pipe Cleaning

Check mark

CAUTION: Possible contact with hazardous media and hazardous substances, cold or warm. Operate only provided with apposite protective devices.

Check mark

Pre-Cleaning Safety Measures

Check mark

Wear appropriate protective devices

Check mark

Pipe and Reservoir Cleaning

Check mark

Remove loose materials from piping

Check mark

Remove foreign particles from reservoirs

Check mark

Post-Welding Cleaning

Check mark

Pay particular attention to cleaning welded piping

Check mark

Ensure components welded to piping are clean

Run this procedureArrow right

Initial 50 Hours Oil Change

Check mark

Preparation

Check mark

Ensure the engine is off and cooled down before starting the oil change.

Check mark

Gather necessary tools and materials (oil-cruet, new oil, etc.).

Check mark

Select the oil type to be used

Check mark

Oil Draining

Check mark

Remove the vent plug of the bearing frame.

Check mark

Upset the oil-cruet to drain the old oil.

Check mark

Has all the old oil been drained completely?

Check mark

Oil Filling

Run this procedureArrow right

4000 Hourly Oil Change

Check mark

Initial Setup

Check mark

Remove vent plug of the bearing frame

Check mark

Oil Filling Procedure

Check mark

Upset the oil-cruet

Check mark

Pour oil into the bearing frame through the hole of plug till you can see oil in the oil-filler elbow

Check mark

Fill the oil-filler pouring oil directly into the oil-cruet and NOT into the elbow

Check mark

Replace the cruet in normal position

Check mark

Let oil flow into bearing frame

Check mark

Repeat operation till the oil level in the cruet ceases to decrease

Run this procedureArrow right

Pressure Test

Check mark

!DANGER: Danger due to fluids in pressure. Carry out sealing tests provided with apposite protective devices.

Check mark

Pre-Test Setup

Check mark

Ensure all protective devices are in place

Check mark

Verify that the installation is complete

Check mark

Static Pressure Test

Check mark

Record the static pressure reading

Check mark

Is the static pressure within the acceptable range?

Check mark

Vacuum Test

Check mark

Record the vacuum pressure reading

Run this procedureArrow right

Packing Seals Adjustment

Check mark

Adjustment of Packing Seals Without External Flushing

Check mark

Loosen the stuffing box nuts to allow a strong drip to escape

Check mark

Verify the extent of the leak (drops per minute)

Check mark

Tighten the stuffing box nuts progressively until the leak is reduced to a continuous and controlled drip

Check mark

Wait a few minutes to allow the leak to stabilize

Check mark

Check the temperature of the liquid that comes out

Check mark

Is the temperature at least ten degrees lower than the boiling temperature of the flushing liquid and below 90°C?

Check mark

Is the dripping rate correct (60 drops per minute for 20 mm shaft, up to 200 drops per minute for 100 mm shaft)?

Check mark

Adjust the dripping if the temperature is high or dripping is insufficient

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Pompetravaini

Explore Other Assets