

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Pompetravaini Pump TC40-125
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
17500 Hourly Bearing Replacement
Safety Precautions
Ensure the pump is completely stopped before handling the unit.
Drain the pump or close the pipes using a valve to prevent sudden rotation.
Wait for the pump to cool to avoid contact with high temperature surfaces.
Disconnect the power supply and any other connections before starting maintenance.
Ensure power supply is restored only by the maintenance operator.
Ensure the presence of at least two operators during maintenance.
Inform the foreman that maintenance is in progress.
Use appropriate protective devices.
4000 Hourly Oil Replacement
Oil Replacement Procedure
Pour oil directly into the cruet
Ensure oil is not poured into the elbow of the oil-filler or bearing frame plug
Oil Change Frequency
Select the oil change frequency based on operating conditions
Bearing Temperature Check
Record the bearing temperature
Is the bearing temperature below 85°C/185°F?
Oil pH and Viscosity Check
4000 Hourly Seal Check
Seal Inspection
Record the total working hours of the mechanical seal
Is the mechanical seal within the acceptable life span of 4000 hours?
Inspect the wear of seal faces
Seal Replacement
Was the mechanical seal replaced?
Check the condition of the shaft sleeve if present
Is the shaft sleeve surface damaged or doubtful?
Replace the shaft sleeve if necessary
Initial 50 Hours Oil Replacement
Preparation
Ensure the pump is turned off and cooled down
Gather necessary tools and materials (oil, oil-cruet, etc.)
Oil Draining
Remove the vent plug of the bearing frame
Dispose of the exhausted oil following current regulations
Oil Filling
Upset the oil-cruet
Pour oil into the bearing frame through the hole of the plug until oil is visible in the oil-filler elbow
Initial 6 Months Lubricant Replacement
Long Term Storage Inspection
Ensure the following actions are considered
Lubricant Replacement
Replace the lubricant completely
Bearing Inspection
Inspect the bearings
Were the bearings cleaned?
O-rings and Gaskets Inspection
Inspect O-rings and gaskets
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













