MaintainX Asset Hub logo
EnterprisePricing
Pompetravaini

Pompetravaini Pump TC50-160

Need answers fast?
Explore the manual using AI.

Pompetravaini Pump TC50-160
Pompetravaini Pump TC50-160

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Pompetravaini Pump TC50-160

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Pompetravaini Pump TC50-160

Pompetravaini Pump TC50-160

Create an account to install this asset package.

Maintenance Plans for Pompetravaini Pump Model TC50-160

Integrate maintenance plans directly into your work orders in MaintainX.

17500 Hourly Bearing Replacement

Check mark

Safety Precautions

Check mark

Ensure the pump is completely stopped before handling

Check mark

Drain the pump or close the pipes using a valve to prevent sudden rotation

Check mark

Wait for the pump to cool to avoid contact with high temperature surfaces

Check mark

Disconnect the power supply and any other connections

Check mark

Ensure power supply is restored only by the maintenance operator

Check mark

Ensure the presence of at least two operators during maintenance

Check mark

Inform the foreman that maintenance is in progress

Check mark

Use appropriate protective devices

Run this procedureArrow right

1 Yearly Pump Check

Check mark

Instrument Readings

Check mark

Record the gauge reading

Check mark

Record the amp meter reading

Check mark

Record the flow meter reading

Check mark

Operational Check

Check mark

Is the pump operating without abnormal vibrations or noises?

Check mark

Describe any abnormal vibrations or noises detected

Check mark

Alignment and Running Conditions

Check mark

Check pump/motor alignment

Run this procedureArrow right

Initial 6 Months Lubricant Replacement

Check mark

Long Term Storage Inspection

Check mark

Ensure machine is properly stored as per instructions

Check mark

Has the storage period exceeded 12 months?

Check mark

Lubricant Replacement

Check mark

Completely replace the lubricant

Check mark

Component Inspection

Check mark

Inspect and clean bearings if necessary

Check mark

Inspect O-rings and gaskets and replace if necessary

Check mark

Inspect mechanical seal integrity and replace if necessary

Run this procedureArrow right

4000 Hourly Seal Check

Check mark

Seal Inspection

Check mark

Record the total working hours of the mechanical seal

Check mark

Is the mechanical seal within the acceptable life span of 4000 hours?

Check mark

Inspect the wear of seal faces

Check mark

Seal Replacement

Check mark

Was the mechanical seal replaced?

Check mark

Check the condition of the shaft sleeve if present

Check mark

Is the shaft sleeve surface damaged or doubtful?

Check mark

Replace the shaft sleeve if necessary

Run this procedureArrow right

4000 Hourly Oil Replacement

Check mark

Oil Replacement Procedure

Check mark

Pour oil directly into the cruet

Check mark

Ensure oil is not poured into the elbow of the oil-filler or bearing frame plug

Check mark

Oil Change Frequency

Check mark

Select oil change frequency based on conditions

Check mark

Bearing Temperature Check

Check mark

Record bearing temperature

Check mark

Is bearing temperature below 85°C/185°F?

Check mark

Oil pH and Viscosity Check

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Pompetravaini

Explore Other Assets