

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Pompetravaini Pump TC65-200
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Initial 6 Months Lubricant Replacement
Long Term Storage Inspection
Ensure machine is properly stored as per instructions
Has the storage period exceeded 12 months?
Lubricant Replacement
Completely replace the lubricant
Component Inspection
Inspect and clean bearings if necessary
Inspect O-rings and gaskets (replace if necessary)
Inspect mechanical seal integrity (replace if necessary)
4000 Hourly Oil Replacement
Oil Filling Instructions
Pour oil directly into the cruet, not into the elbow of the oil-filler or bearing frame plug
Oil Change Frequency
Select the oil change frequency based on operating conditions
Bearing Temperature Check
Enter the current bearing temperature in °C/°F
Is the bearing temperature within the normal range (≤ 85°C/185°F)?
Oil pH and Viscosity Check
Enter the oil pH value
Initial 50 Hours Oil Replacement
Preparation
Ensure the pump is turned off and cooled down
Gather necessary tools and materials for oil replacement
Oil Draining
Remove the vent plug of the bearing frame
Upset the oil-cruet to allow oil to drain completely
Has all the old oil been drained?
Oil Filling
Pour oil into the bearing frame through the hole of the plug until oil is visible in the oil-filler elbow
2000 Hourly Bearing Maintenance
Preparation
Ensure the pump is turned off and isolated from the power source.
Gather necessary tools and materials, including high-quality lubricating grease.
Inspection and Cleaning
Inspect the following pump series for self-lubricated ball bearings
Are the bearings sealed and pre-greased?
Clean the bearings if they are not sealed and pre-greased.
Lubrication
Is the bearing temperature within normal range (not exceeding 85°C)?
4000 Hourly Seal Check
Seal Inspection
Record the total working hours of the mechanical seal
Inspect the wear of seal faces
Has the mechanical seal exceeded its normal life span of 4000 hours?
Seal Replacement
Is the mechanical seal being replaced?
Check the condition of the shaft sleeve
Is the shaft sleeve damaged or doubtful?
Replace the shaft sleeve if necessary
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













