

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Pompetravaini Pump TC50-200
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Pump Check
Instrument Readings
Enter the gauge reading
Enter the amp meter reading
Enter the flow meter reading
Pump Operation Check
Is the pump operating without abnormal vibrations or noises?
Describe any abnormal vibrations or noises observed
Pump/Motor Alignment and Condition Check
Check the pump/motor alignment
Initial 6 Months Lubricant Replacement
Long Term Storage Inspection
Ensure machine is properly stored as per instructions
Has the storage period exceeded 12 months?
Lubricant Replacement
Completely replace the lubricant
Component Inspection
Inspect and clean bearings if necessary
Inspect O-rings and gaskets (replace if necessary)
Inspect mechanical seal integrity (replace if necessary)
4000 Hourly Seal Check
Seal Inspection
Record the total working hours of the seal
Inspect the wear of seal faces
Is the wear within acceptable limits?
Seal Replacement
Was the mechanical seal replaced?
Check the condition of the shaft sleeve if present
Is the shaft sleeve surface damaged or doubtful?
Replace the shaft sleeve if necessary
Initial 50 Hours Oil Replacement
Preparation
Ensure the pump is turned off and cooled down
Gather necessary tools and materials (oil, oil-cruet, etc.)
Oil Draining
Remove the vent plug of the bearing frame
Drain the old oil completely
Dispose of the exhausted oil following current regulations
Oil Filling
Upset the oil-cruet
4000 Hourly Oil Replacement
Oil Replacement Procedure
Pour oil directly into the cruet, not into the elbow of the oil-filler or bearing frame plug
Check for oil contamination risks
Is the bearing frame oil bath temperature below 60°C/140°F?
Is the bearing temperature below 85°C/185°F?
Check for potential causes of overheating
Oil Quality and Viscosity Check
Measure the oil pH level
Consult supplier for acceptable pH values and record observations
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













