Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Pompetravaini Pump TC50-315
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
17500 Hourly Bearing Replacement
Safety Precautions
Ensure the pump is completely stopped before handling
Drain the pump or close the pipes using a valve to prevent sudden rotation
Wait for the pump to cool to avoid contact with high temperature surfaces
Disconnect the power supply and any other connections
Ensure power supply is restored only by the maintenance operator
Ensure the presence of at least two operators during maintenance
Inform the foreman that maintenance is in progress
Use appropriate protective devices
1 Yearly Pump Check
Instrument Readings
Record the gauge readings
Record the amp meter readings
Record the flow meter readings
Operational Checks
Is the pump operating without abnormal vibrations or noises?
Check the alignment and conditions
Auxiliary Supply Lines
Check the flow of auxiliary supply lines
4000 Hourly Oil Replacement
Oil Replacement Procedure
Pour oil directly into the cruet, not into the elbow of the oil-filler or bearing frame plug
Check for potential oil contamination
Record the temperature in the bearing frame oil bath
Is the temperature in the bearing frame oil bath below 60°C/140°F?
Is the bearing temperature below 85°C/185°F?
Check for potential causes of overheating
Oil Quality Check
Measure the oil viscosity at 40°C/104°F
Initial 6 Months Lubricant Replacement
Long Term Storage Inspection
Ensure machine is properly stored as per instructions
Has the storage period exceeded 12 months?
Lubricant Replacement
Completely replace the lubricant
Component Inspection
Inspect and clean bearings if necessary
Inspect O-rings and gaskets (replace if necessary)
Inspect mechanical seal integrity (replace if necessary)
2000 Hourly Bearing Maintenance
Initial Inspection
Verify pump series and bearing type
Is the bearing temperature within normal range (below 85°C)?
Bearing Maintenance for TMA Pumps
Clean the ball bearings thoroughly
Apply new lubricating grease to the ball bearings
Ensure not to over lubricate the bearings
Sealed Pre-Greased Bearings Check
Inspect sealed pre-greased bearings for any issues
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX