PDF MANUAL

Manual for Pompetravaini Centrifugal Pump AT

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Pompetravaini Centrifugal Pump AT

Pompetravaini Centrifugal Pump AT

Create an account to install this asset package.

Maintenance Plans for Pompetravaini Centrifugal Pump Model AT

Integrate maintenance plans directly into your work orders in MaintainX.

Packing Seals Adjustment

Check mark

Adjustment of Packing Seals Without External Flushing

Check mark

Verify pump configuration

Check mark

Loosen stuffing box nuts to allow strong drip

Check mark

Measure the initial leak rate (drops per minute)

Check mark

Tighten stuffing box nuts progressively to reduce leak to controlled drip

Check mark

Measure stabilized leak rate (drops per minute)

Check mark

Is the leak rate within acceptable range (60-200 drops per minute)?

Check mark

Measure temperature of the leaking liquid

Check mark

Is the temperature at least 10°C below boiling point and below 90°C?

Run this procedureArrow right

4000 Hourly Oil Change

Check mark

Initial Preparations

Check mark

Ensure the engine is off and cooled down

Check mark

Gather necessary tools and materials for oil change

Check mark

Oil Draining and Disposal

Check mark

Remove vent plug of the bearing frame

Check mark

Drain the old oil from the bearing frame

Check mark

Dispose of the exhausted oil following current regulations and environmental protection measures

Check mark

Oil Filling Procedure

Check mark

Upset the oil-cruet

Run this procedureArrow right

Pressure Test

Check mark

!DANGER: Danger due to fluids in pressure. Carry out sealing tests provided with apposite protective devices.

Check mark

Pre-Test Setup

Check mark

Ensure all protective devices are in place

Check mark

Verify that the installation is complete

Check mark

Pressure Testing

Check mark

Record the static pressure reading

Check mark

Is the static pressure within the acceptable range?

Check mark

Record the vacuum pressure reading

Check mark

Is the vacuum pressure within the acceptable range?

Run this procedureArrow right

Initial 50 Hours Oil Change

Check mark

Preparation

Check mark

Ensure the engine is off and cooled down

Check mark

Gather necessary tools and materials (oil, oil-cruet, etc.)

Check mark

Oil Draining

Check mark

Remove vent plug of the bearing frame

Check mark

Dispose of the exhausted oil following current regulations

Check mark

Oil Filling

Check mark

Upset the oil-cruet

Check mark

Pour oil into the bearing frame through the hole of plug till oil is visible in the oil-filler elbow

Run this procedureArrow right

Pipe Cleaning

Check mark

!CAUTION: Possible contact with hazardous media and hazardous substances, cold or warm. Operate only provided with apposite protective devices.

Check mark

Pre-Cleaning Safety Measures

Check mark

Wear appropriate protective devices

Check mark

Cleaning Procedure

Check mark

Clean piping and any reservoirs to remove loose materials and foreign particles

Check mark

Was particular attention given to installations where welding of piping and components has taken place?

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Pompetravaini

Explore Other Assets