

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Leybold Vacuum Pump TURBOVAC 90iX DN63ISO-K
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Pump Startup Check
Switching on
Switch on the power supply.
Did all LEDs come on sequentially?
Enter the maximum starting pressure for the turbomolecular pump.
Switch on the turbomolecular pump via pins 7 and 8 of the socket REMOTE (X1).
Is the turbomolecular pump accelerating?
Is the green LED flashing?
Is the green LED permanently lit indicating normal operation?
Cautionary Measures
Pump Cleaning
Cleaning
Clean the turbomolecular pump of dust with a dry cloth if required
Check for grime inside the converter
Contact Leybold Service Department for converter cleaning if grime is detected
1 Yearly Air Filter Maintenance
4.1 Media compatibility / purge gas
Verify media compatibility
Check purge gas options
Change the air filters
Pump Leak Testing
0.4 Hazards caused by materials and substances
Ensure the forevacuum line is tight
Check for hazardous gases escaping at leaks
Verify that gases being pumped do not react with air or humidity
Perform a leak search after installing the pump or after service work
Verify the pump's integral leak rate is < 1·10-8 mbar·l/s upon delivery
Conduct regular leak searches when pumping toxic gases
80000 Hourly Rotor Unit Maintenance
5 Maintenance
Observe Safety information 0.1.7
Exchange the rotor unit after 80,000 operating hours
Contact Leybold Service for rotor unit maintenance
Find the nearest Leybold service center address on www.leybold.com
Consult Leybold for recommendations if operating under high pump loads
Access the parts list for your equipment in MaintainX.
Power Supply Turbo.Power Integra Incl. 0.3 M Cable
800100V0003
Cable Turbovac I/Ix - Turbo.Power Integra 1 M
800096V0100
Cable Turbovac I/Ix - Turbo.Power Integra 3 M
800096V0300
Cable Turbovac I/Ix - Turbo.Power Integra 5 M
800096V0500
Power Supply And Control Unit Turbo.Control 300
800100V0001
Power Supply Turbo.Power Integra Incl. 0.3 M Cable
800100V0003
Cable Turbovac I/Ix - Turbo.Power Integra 1 M
800096V0100
Cable Turbovac I/Ix - Turbo.Power Integra 3 M
800096V0300
Cable Turbovac I/Ix - Turbo.Power Integra 5 M
800096V0500
Power Supply And Control Unit Turbo.Control 300
800100V0001
Power Supply Turbo.Power Integra Incl. 0.3 M Cable
800100V0003
Cable Turbovac I/Ix - Turbo.Power Integra 1 M
800096V0100
Cable Turbovac I/Ix - Turbo.Power Integra 3 M
800096V0300
Cable Turbovac I/Ix - Turbo.Power Integra 5 M
800096V0500
Power Supply And Control Unit Turbo.Control 300
800100V0001
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













