Leybold Vacuum Pump TURBOVAC 250i DN100ISO-K

Need answers fast?
Explore the manual using AI.

Leybold Vacuum Pump TURBOVAC 250i DN100ISO-K
Leybold Vacuum Pump TURBOVAC 250i DN100ISO-K

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Leybold Vacuum Pump TURBOVAC 250i DN100ISO-K

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Leybold Vacuum Pump TURBOVAC 250i DN100ISO-K

Leybold Vacuum Pump TURBOVAC 250i DN100ISO-K

Create an account to install this asset package.

Maintenance Plans for Leybold Vacuum Pump Model TURBOVAC 250i DN100ISO-K

Integrate maintenance plans directly into your work orders in MaintainX.

Pump Cleaning

Check mark

5.1 Cleaning

Check mark

Clean the turbomolecular pump of dust with a dry cloth, if required.

Check mark

Check if the converter has collected grime (dust, moisture) on the inside.

Check mark

Ensure no grime is present to avoid malfunctions, overheating, or short circuits.

Check mark

Note if Leybold Service Department assistance is required for cleaning the converter.

Run this procedureArrow right

Bearing Maintenance

Check mark

Maintenance

Check mark

Determine if bearing replacement is required

Check mark

Contact after sales service for on-site bearing replacement

Check mark

Request a quotation for bearing replacement at Leybold Service Center

Run this procedureArrow right

1 Yearly Air Filter Maintenance

Check mark

4.1 Media compatibility / purge gas

Check mark

Verify media compatibility

Check mark

Check purge gas

Check mark

Inspect air filters

Check mark

Change air filters

Run this procedureArrow right

Pump Startup Check

Check mark

Switching on

Check mark

Switch on the power supply.

Check mark

Verify all LEDs come on sequentially and drive electronics are running up.

Check mark

Enter the maximum starting pressure for the turbomolecular pump.

Check mark

Switch on the turbomolecular pump via pins 7 and 8 of the socket REMOTE (X1).

Check mark

Confirm the turbomolecular pump accelerates and the green LED flashes.

Check mark

Is the green LED lit permanently indicating normal operation?

Check mark

Cautionary Measures

Check mark

Avoid influences of shock and vibration when the pump is running.

Run this procedureArrow right

80000 Hourly Rotor Unit Maintenance

Check mark

5 Maintenance

Check mark

Observe Safety information 0.1.7

Check mark

Exchange the rotor unit after 80,000 operating hours

Check mark

Contact Leybold Service for rotor unit maintenance

Check mark

Find the nearest Leybold service center address on www.leybold.com

Check mark

Consider advancing maintenance work for high pump loads

Check mark

Consult Leybold for maintenance recommendations

Run this procedureArrow right

Parts for Leybold Vacuum Pump TURBOVAC 250i DN100ISO-K

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Power Supply Turbo.Power Integra Incl. 0.3 M Cable

800100V0003

Cable Turbovac I/Ix - Turbo.Power Integra 1 M

800096V0100

Cable Turbovac I/Ix - Turbo.Power Integra 3 M

800096V0300

Cable Turbovac I/Ix - Turbo.Power Integra 5 M

800096V0500

Power Supply And Control Unit Turbo.Control 300

800100V0001

Power Supply Turbo.Power Integra Incl. 0.3 M Cable

800100V0003

Cable Turbovac I/Ix - Turbo.Power Integra 1 M

800096V0100

Cable Turbovac I/Ix - Turbo.Power Integra 3 M

800096V0300

Cable Turbovac I/Ix - Turbo.Power Integra 5 M

800096V0500

Power Supply And Control Unit Turbo.Control 300

800100V0001

Power Supply Turbo.Power Integra Incl. 0.3 M Cable

800100V0003

Cable Turbovac I/Ix - Turbo.Power Integra 1 M

800096V0100

Cable Turbovac I/Ix - Turbo.Power Integra 3 M

800096V0300

Cable Turbovac I/Ix - Turbo.Power Integra 5 M

800096V0500

Power Supply And Control Unit Turbo.Control 300

800100V0001

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Leybold

Explore Other Assets