KSB SE & Co. KGaA Standardised Chemical Pump MCPK065-40-200
KSB SE & Co. KGaA Standardised Chemical Pump MCPK065-40-200

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for KSB SE & Co. KGaA Standardised Chemical Pump MCPK065-40-200

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

KSB SE & Co. KGaA Standardised Chemical Pump MCPK065-40-200

KSB SE & Co. KGaA Standardised Chemical Pump MCPK065-40-200

Create an account to install this asset package.

Maintenance Plans for KSB SE & Co. KGaA Standardised Chemical Pump Model MCPK065-40-200

Integrate maintenance plans directly into your work orders in MaintainX.

Grease Change

Check mark

Safety Precaution

Check mark

Caution: Mixing Greases Of Differing Soap Bases

Check mark

Bearing Cleaning and Adjustment

Check mark

Thoroughly clean the bearings

Check mark

Adjust the re-lubrication intervals to the grease used

Check mark

Pump Dismantling Confirmation

Check mark

Grease Filling

Check mark

Half-fill the bearing cavities with grease

Check mark

Fill the cavities in the bearing cover until they are about 1/3 full

Run this procedureArrow right

Gland Packing Removal

Check mark

Verify preliminary steps

Check mark

Gland Packing Removal Steps

Check mark

Undo hexagon nuts 920.02 at gland follower 452 and remove the gland follower

Check mark

Unscrew hexagon nuts 920.04, if any

Check mark

Remove casing cover 161 from bearing bracket 330

Check mark

Remove stuffing box ring 454.01 and drip plate 463.01

Check mark

Remove packing rings 461.01 and lantern ring 458.01, if any, from the packing chamber

Check mark

Pull shaft protecting sleeve 524.01 and thrower 507.01 off shaft 210

Run this procedureArrow right

Back Pull-Out Unit Removal

Check mark

WARNING — Back Pull-Out Unit Tipping Over. Risk of crushing hands and feet!

Check mark

Suspend or support the bearing bracket at the pump end.

Check mark

Suspend or support bearing bracket 330 to prevent it from tipping over, if required.

Check mark

Unbolt support foot 183 from the baseplate.

Check mark

Undo hexagon nut 920.01 at the volute casing.

Check mark

Pull the back pull-out unit out of the volute casing.

Check mark

Remove and dispose of joint ring 411.10.

Check mark

Place the back pull-out unit on a clean and level surface.

Check mark

Check that all tools are accounted for and stored properly.

Run this procedureArrow right

Initial 300 Hours Rolling Element Bearing Oil Change

Check mark

DANGER — Excessive Temperatures

Check mark

Check the condition of the lubricant regularly

Check mark

Oil Change Intervals

Check mark

Verify oil change intervals based on temperature

Check mark

Oil Quality

Check mark

Ensure oil quality meets specifications

Check mark

Oil Quantity

Check mark

Select the correct oil quantity for the model

Check mark

Special Considerations

Run this procedureArrow right

Motor Removal

Check mark

NOTE: On pump sets with spacer-type couplings, the back pull-out unit can be removed while the motor remains bolted to the baseplate.

Check mark

WARNING — Motor Tipping Over. Risk of crushing hands and feet!

Check mark

Suspend or support the motor to prevent it from tipping over.

Check mark

Disconnect the motor from the power supply.

Check mark

Unbolt the motor from the baseplate.

Check mark

Shift the motor to separate it from the pump.

Run this procedureArrow right

Parts for KSB SE & Co. KGaA Standardised Chemical Pump MCPK065-40-200

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Shaft

210

Impeller

230

Rolling Element Bearing (Set)

320.02

Radial Ball Bearing

321.01

Radial Ball Bearing (1)

321.02

Shaft

210

Impeller

230

Rolling Element Bearing (Set)

320.02

Radial Ball Bearing

321.01

Radial Ball Bearing (1)

321.02

Shaft

210

Impeller

230

Rolling Element Bearing (Set)

320.02

Radial Ball Bearing

321.01

Radial Ball Bearing (1)

321.02

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from KSB SE & Co. KGaA

Explore Other Assets