Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

KSB SE & Co. KGaA Standardised Chemical Pump MCPK065-40-200
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Grease Change
Safety Precaution
Caution: Mixing Greases Of Differing Soap Bases
Bearing Cleaning and Adjustment
Thoroughly clean the bearings
Adjust the re-lubrication intervals to the grease used
Pump Dismantling Confirmation
Grease Filling
Half-fill the bearing cavities with grease
Fill the cavities in the bearing cover until they are about 1/3 full
Gland Packing Removal
Verify preliminary steps
Gland Packing Removal Steps
Undo hexagon nuts 920.02 at gland follower 452 and remove the gland follower
Unscrew hexagon nuts 920.04, if any
Remove casing cover 161 from bearing bracket 330
Remove stuffing box ring 454.01 and drip plate 463.01
Remove packing rings 461.01 and lantern ring 458.01, if any, from the packing chamber
Pull shaft protecting sleeve 524.01 and thrower 507.01 off shaft 210
Back Pull-Out Unit Removal
WARNING — Back Pull-Out Unit Tipping Over. Risk of crushing hands and feet!
Suspend or support the bearing bracket at the pump end.
Suspend or support bearing bracket 330 to prevent it from tipping over, if required.
Unbolt support foot 183 from the baseplate.
Undo hexagon nut 920.01 at the volute casing.
Pull the back pull-out unit out of the volute casing.
Remove and dispose of joint ring 411.10.
Place the back pull-out unit on a clean and level surface.
Check that all tools are accounted for and stored properly.
Initial 300 Hours Rolling Element Bearing Oil Change
DANGER — Excessive Temperatures
Check the condition of the lubricant regularly
Oil Change Intervals
Verify oil change intervals based on temperature
Oil Quality
Ensure oil quality meets specifications
Oil Quantity
Select the correct oil quantity for the model
Special Considerations
Motor Removal
NOTE: On pump sets with spacer-type couplings, the back pull-out unit can be removed while the motor remains bolted to the baseplate.
WARNING — Motor Tipping Over. Risk of crushing hands and feet!
Suspend or support the motor to prevent it from tipping over.
Disconnect the motor from the power supply.
Unbolt the motor from the baseplate.
Shift the motor to separate it from the pump.
Access the parts list for your equipment in MaintainX.
Shaft
210
Impeller
230
Rolling Element Bearing (Set)
320.02
Radial Ball Bearing
321.01
Radial Ball Bearing (1)
321.02
Shaft
210
Impeller
230
Rolling Element Bearing (Set)
320.02
Radial Ball Bearing
321.01
Radial Ball Bearing (1)
321.02
Shaft
210
Impeller
230
Rolling Element Bearing (Set)
320.02
Radial Ball Bearing
321.01
Radial Ball Bearing (1)
321.02
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













