MaintainX Asset Hub logo
EnterprisePricing
KSB SE & Co. KGaA

KSB SE & Co. KGaA Standardised Water Pump ETN 150-125-250

Need answers fast?
Explore the manual using AI.

KSB SE & Co. KGaA Standardised Water Pump ETN 150-125-250
KSB SE & Co. KGaA Standardised Water Pump ETN 150-125-250

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for KSB SE & Co. KGaA Standardised Water Pump ETN 150-125-250

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

KSB SE & Co. KGaA Standardised Water Pump ETN 150-125-250

KSB SE & Co. KGaA Standardised Water Pump ETN 150-125-250

Create an account to install this asset package.

Maintenance Plans for KSB SE & Co. KGaA Standardised Water Pump Model ETN 150-125-250

Integrate maintenance plans directly into your work orders in MaintainX.

Initial 300 Hours Rolling Element Bearing Oil Change

Check mark

Prerequisites

Check mark

Ensure a suitable container for the used oil is on hand

Check mark

Oil Draining Procedure

Check mark

Place the container underneath the screw plug

Check mark

Undo the screw plug (2) at the bearing bracket (3) and drain the oil

Check mark

Re-insert and re-tighten the screw plug (2) after draining

Check mark

Oil Refill Procedure

Check mark

Re-fill with oil

Check mark

Select the shaft unit and confirm oil quantity per bearing bracket

Run this procedureArrow right

Coupling Inspection

Check mark

Coupling Check

Check mark

Inspect the flexible elements of the coupling for wear

Check mark

Is replacement of any coupling parts necessary?

Check mark

Check the alignment of the coupling

Check mark

Safety Inspection

Check mark

Inspect the coupling guard for deformation

Check mark

Check plastic components for deformation

Check mark

Ensure sufficient distance of guards from rotating parts

Check mark

Hazard Awareness

Run this procedureArrow right

15000 Hourly / 2 Yearly Rolling Element Bearing Grease Replacement

Check mark

Preparation

Check mark

Ensure the pump is dismantled for grease changing

Check mark

Are the operating conditions unfavourable? (e.g. high temperature, humidity, dust)

Check mark

Removing Outer Cover Plates

Check mark

Remove the outer cover plate of each bearing with a suitable tool

Check mark

Dispose of the cover plates

Check mark

Grease Application

Check mark

Select the shaft unit and apply the correct grease quantity

Check mark

Only half-fill the bearing cavities with grease

Run this procedureArrow right

Bearing Seal Inspection

Check mark

Seal Ring Inspection

Check mark

Check correct seating of axial seal rings mounted on the shaft

Check mark

Is there only gentle contact of the sealing lip?

Check mark

Safety Check

Check mark

Ensure no excessive temperatures caused by mechanical contact

Run this procedureArrow right

Impeller Clearance Check

Check mark

Initial Inspection

Check mark

Remove the impeller if clearances need to be checked.

Check mark

Clearance Measurement

Check mark

Measure the clearance between the impeller and casing.

Check mark

Select the impeller material

Check mark

Clearance Evaluation

Check mark

Is the clearance within the permitted range for the selected impeller material?

Check mark

Fit new casing wear ring 502.1 and/or 502.2 if clearance is larger than permitted.

Check mark

Documentation

Run this procedureArrow right

Parts for KSB SE & Co. KGaA Standardised Water Pump ETN 150-125-250

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Shaft

210

Impeller

230

Deep Groove Ball Bearing

321.01/.02

Mechanical Seal, Complete Versions With Gland Packing

433

Casing Cover

161

Shaft

210

Impeller

230

Deep Groove Ball Bearing

321.01/.02

Mechanical Seal, Complete Versions With Gland Packing

433

Casing Cover

161

Shaft

210

Impeller

230

Deep Groove Ball Bearing

321.01/.02

Mechanical Seal, Complete Versions With Gland Packing

433

Casing Cover

161

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from KSB SE & Co. KGaA

Explore Other Assets