MaintainX Asset Hub logo
EnterprisePricing
KSB SE & Co. KGaA

KSB SE & Co. KGaA Standardised Water Pump ETN 080-65-315

Need answers fast?
Explore the manual using AI.

KSB SE & Co. KGaA Standardised Water Pump ETN 080-65-315
KSB SE & Co. KGaA Standardised Water Pump ETN 080-65-315

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for KSB SE & Co. KGaA Standardised Water Pump ETN 080-65-315

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

KSB SE & Co. KGaA Standardised Water Pump ETN 080-65-315

KSB SE & Co. KGaA Standardised Water Pump ETN 080-65-315

Create an account to install this asset package.

Maintenance Plans for KSB SE & Co. KGaA Standardised Water Pump Model ETN 080-65-315

Integrate maintenance plans directly into your work orders in MaintainX.

Bearings Dismantling

Check mark

Observe and carry out notes and steps from Section 7.4.1 to Section 7.4.6

Check mark

Place the bearing bracket in a clean and level assembly area

Check mark

Undo the grub screw in the coupling hub

Check mark

Pull the coupling hub off shaft 210 with a special puller

Check mark

Remove key 940.02

Check mark

Remove thrower 507.01

Check mark

Remove pump-end bearing cover 360.01 and drive-end bearing cover 360.02

Check mark

Remove hexagon head bolts 901.01 and 901.02 as well as gaskets 400.01 and 400.02

Check mark

Press shaft 210 out of the shaft seat

Run this procedureArrow right

Pump Cleaning

Check mark

Drainage and Cleaning

Check mark

Use connection 6B to drain the fluid handled

Check mark

Flush the pump if it has been used for handling noxious, explosive, hot or other hazardous fluids

Check mark

Flush and clean the pump before transporting it to the workshop

Check mark

Provide a cleaning record for the pump

Check mark

Safety and Disposal

Check mark

Wear appropriate safety clothing and protective gear

Check mark

Collect and properly dispose of flushing fluid and any residues of the fluid handled

Check mark

Observe all legal regulations on the disposal of fluids posing a health hazard

Run this procedureArrow right

Initial Motor Mounting

Check mark

Check applicability of steps 1 and 2

Check mark

Shift the motor to connect it to the pump via the coupling

Check mark

Fasten the motor to the baseplate

Check mark

Align pump and motor

Check mark

Connect the motor to the power supply

Run this procedureArrow right

Impeller Clearance Check

Check mark

Initial Inspection

Check mark

Check if the clearances need to be checked

Check mark

Impeller Removal

Check mark

Remove the impeller if clearances need to be checked

Check mark

Clearance Measurement

Check mark

Measure the clearance between impeller and casing

Check mark

Measure the clearance between impeller and casing cover

Check mark

Clearance Evaluation

Check mark

Select the impeller material

Run this procedureArrow right

1 Weekly Pump Set Inspection

Check mark

Operational Observations

Check mark

Pump runs quietly and free from vibrations

Check mark

Is the oil level correct for oil lubrication?

Check mark

Shaft seal is in good condition

Check mark

Static seals are free from leakage

Check mark

Rolling element bearings are free from running noises

Check mark

Auxiliary connections are functioning correctly

Check mark

Stand-by Pump Monitoring

Check mark

Start the stand-by pump to ensure readiness for operation

Run this procedureArrow right

Parts for KSB SE & Co. KGaA Standardised Water Pump ETN 080-65-315

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Shaft

210

Impeller

230

Deep Groove Ball Bearing

321.01/.02

Mechanical Seal, Complete Versions With Gland Packing

433

Casing Cover

161

Shaft

210

Impeller

230

Deep Groove Ball Bearing

321.01/.02

Mechanical Seal, Complete Versions With Gland Packing

433

Casing Cover

161

Shaft

210

Impeller

230

Deep Groove Ball Bearing

321.01/.02

Mechanical Seal, Complete Versions With Gland Packing

433

Casing Cover

161

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from KSB SE & Co. KGaA

Explore Other Assets