Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

KSB SE & Co. KGaA Chemical Pump CPKN 40-250
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Initial 300 Hours Chemical Pump Oil Change
Safety Precautions
Ensure maintenance work is performed outside potentially explosive atmospheres.
Verify that the pump set cannot be started up unintentionally.
Disconnect electrical connections before starting work on the pump set.
Secure the pump set to prevent tipping or falling over during assembly/dismantling.
Preparation
Ensure all maintenance work is performed by authorised, qualified specialist personnel.
Prepare a maintenance schedule focusing on lubricants, shaft seal, and coupling.
Oil Change Procedure
Chemical Pump Clearances Check
Safety Precautions
Ensure compliance with safety regulations at the installation site.
Perform maintenance outside potentially explosive atmospheres.
Ensure maintenance is performed by authorized, qualified personnel.
Disconnect electrical connections before starting work on the pump set.
Secure the pump to prevent tipping or falling during assembly/dismantling.
Preparation
Prepare a maintenance schedule focusing on lubricants, shaft seal, and coupling.
Ensure the pump set cannot be started unintentionally.
16000 Hourly / 2 Yearly Bearing Grease Change
Safety Precautions
Ensure all safety regulations at the place of installation are observed.
Perform maintenance work on explosion-proof pump sets outside potentially explosive atmospheres.
Ensure the pump set cannot be started up unintentionally.
Disconnect electrical connections before carrying out work on the pump set.
Take appropriate measures to protect persons and the environment when draining fluids.
Secure the pump set/pump parts to prevent tipping or falling over during assembly/dismantling.
Preparation
Ensure maintenance, inspection, and installation work is performed by authorised, qualified specialist personnel.
1 Weekly Chemical Pump Check
Safety Precautions
Ensure all safety regulations at the installation site are observed.
Perform maintenance work on explosion-proof pump sets outside potentially explosive atmospheres.
Ensure the pump set cannot be started up unintentionally.
Disconnect electrical connections before carrying out work on the pump set.
Take appropriate measures to protect persons and the environment when draining fluids.
Secure the pump set/pump parts to prevent tipping or falling over during assembly/dismantling.
Maintenance Schedule Preparation
Prepare a maintenance schedule with emphasis on lubricants, shaft seal, and coupling.
5000 Hourly / 1 Yearly Bearings Lubrication
Safety Precautions
Ensure maintenance work is performed outside potentially explosive atmospheres.
Verify that the pump set cannot be started up unintentionally.
Disconnect electrical connections before starting work on the pump set.
Secure the pump set to prevent tipping or falling over during assembly/dismantling.
Preparation
Ensure maintenance is performed by authorised, qualified specialist personnel.
Prepare a maintenance schedule focusing on lubricants, shaft seal, and coupling.
Lubrication Process
Access the parts list for your equipment in MaintainX.
Impeller
230
Casing Cover
161
Support Foot
183
Shaft
210
Angular Contact Ball Bearing
320.02
Impeller
230
Casing Cover
161
Support Foot
183
Shaft
210
Angular Contact Ball Bearing
320.02
Impeller
230
Casing Cover
161
Support Foot
183
Shaft
210
Angular Contact Ball Bearing
320.02
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX