MaintainX Asset Hub logo
EnterprisePricing
KSB SE & Co. KGaA

KSB SE & Co. KGaA Standardised Water Pump ETN 200-150-200

Need answers fast?
Explore the manual using AI.

KSB SE & Co. KGaA Standardised Water Pump ETN 200-150-200
KSB SE & Co. KGaA Standardised Water Pump ETN 200-150-200

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for KSB SE & Co. KGaA Standardised Water Pump ETN 200-150-200

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

KSB SE & Co. KGaA Standardised Water Pump ETN 200-150-200

KSB SE & Co. KGaA Standardised Water Pump ETN 200-150-200

Create an account to install this asset package.

Maintenance Plans for KSB SE & Co. KGaA Standardised Water Pump Model ETN 200-150-200

Integrate maintenance plans directly into your work orders in MaintainX.

Pump Cleaning

Check mark

Drainage and Cleaning

Check mark

Use connection 6B to drain the fluid handled

Check mark

Flush the pump if it has been used for handling noxious, explosive, hot or other hazardous fluids

Check mark

Flush and clean the pump before transporting it to the workshop

Check mark

Provide a cleaning record for the pump

Check mark

Safety and Disposal

Check mark

Wear appropriate safety gear

Check mark

Collect and properly dispose of flushing fluid and any residues of the fluid handled

Check mark

Describe the disposal method used for hazardous fluids

Run this procedureArrow right

Gland Packing Removal

Check mark

Preliminary Observations

Check mark

Undo nuts 920.02 at the gland follower and loosen gland follower 452

Check mark

Undo nuts 920.15 at casing cover 161

Check mark

Remove casing cover 161 from bearing bracket 330

Check mark

Remove gland follower 452 from casing cover 161 and remove the packing

Check mark

Remove stuffing box ring 454

Check mark

Remove packing rings 461 and lantern ring 458, if any

Check mark

Pull shaft protecting sleeve 524 off shaft 210

Check mark

Remove and dispose of gasket 400.75

Run this procedureArrow right

Pump Set Assembly

Check mark

Safety Precautions

Check mark

Use suitable transport devices, lifting equipment and lifting tackle to move heavy assemblies or components.

Check mark

Reassemble the pump in accordance with the general rules of sound engineering practice.

Check mark

Use original spare parts only.

Check mark

Seal Elements Inspection

Check mark

Check O-rings for any damage and replace by new O-rings, if required.

Check mark

Use new gaskets with the same thickness as the old ones.

Check mark

Fit gaskets of asbestos-free materials or graphite without using lubricants.

Check mark

Assembly Adhesives

Run this procedureArrow right

Pump Set Removal

Check mark

Safety Precautions

Check mark

Ensure only qualified personnel perform work on the pump set.

Check mark

Allow the pump set to cool down to ambient temperature.

Check mark

Use suitable transport devices and lifting equipment for heavy components.

Check mark

Preparation

Check mark

Properly shut down the pump set.

Check mark

Close the shut-off elements in suction and discharge line.

Check mark

Drain the pump and release the pump pressure.

Check mark

Close any auxiliary connections.

Run this procedureArrow right

Bearing Seal Inspection

Check mark

Seal Ring Inspection

Check mark

Check correct seating of axial seal rings mounted on the shaft

Check mark

Is there only gentle contact of the sealing lip?

Check mark

Safety Check

Check mark

Ensure no excessive temperatures caused by mechanical contact

Run this procedureArrow right

Parts for KSB SE & Co. KGaA Standardised Water Pump ETN 200-150-200

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Shaft

210

Impeller

230

Deep Groove Ball Bearing

321.01/.02

Mechanical Seal, Complete Versions With Gland Packing

433

Casing Cover

161

Shaft

210

Impeller

230

Deep Groove Ball Bearing

321.01/.02

Mechanical Seal, Complete Versions With Gland Packing

433

Casing Cover

161

Shaft

210

Impeller

230

Deep Groove Ball Bearing

321.01/.02

Mechanical Seal, Complete Versions With Gland Packing

433

Casing Cover

161

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from KSB SE & Co. KGaA

Explore Other Assets