Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

KSB SE & Co. KGaA Standardised Water Pump ETN 200-150-200
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Pump Cleaning
Drainage and Cleaning
Use connection 6B to drain the fluid handled
Flush the pump if it has been used for handling noxious, explosive, hot or other hazardous fluids
Flush and clean the pump before transporting it to the workshop
Provide a cleaning record for the pump
Safety and Disposal
Wear appropriate safety gear
Collect and properly dispose of flushing fluid and any residues of the fluid handled
Describe the disposal method used for hazardous fluids
Gland Packing Removal
Preliminary Observations
Undo nuts 920.02 at the gland follower and loosen gland follower 452
Undo nuts 920.15 at casing cover 161
Remove casing cover 161 from bearing bracket 330
Remove gland follower 452 from casing cover 161 and remove the packing
Remove stuffing box ring 454
Remove packing rings 461 and lantern ring 458, if any
Pull shaft protecting sleeve 524 off shaft 210
Remove and dispose of gasket 400.75
Pump Set Assembly
Safety Precautions
Use suitable transport devices, lifting equipment and lifting tackle to move heavy assemblies or components.
Reassemble the pump in accordance with the general rules of sound engineering practice.
Use original spare parts only.
Seal Elements Inspection
Check O-rings for any damage and replace by new O-rings, if required.
Use new gaskets with the same thickness as the old ones.
Fit gaskets of asbestos-free materials or graphite without using lubricants.
Assembly Adhesives
Pump Set Removal
Safety Precautions
Ensure only qualified personnel perform work on the pump set.
Allow the pump set to cool down to ambient temperature.
Use suitable transport devices and lifting equipment for heavy components.
Preparation
Properly shut down the pump set.
Close the shut-off elements in suction and discharge line.
Drain the pump and release the pump pressure.
Close any auxiliary connections.
Bearing Seal Inspection
Seal Ring Inspection
Check correct seating of axial seal rings mounted on the shaft
Is there only gentle contact of the sealing lip?
Safety Check
Ensure no excessive temperatures caused by mechanical contact
Access the parts list for your equipment in MaintainX.
Shaft
210
Impeller
230
Deep Groove Ball Bearing
321.01/.02
Mechanical Seal, Complete Versions With Gland Packing
433
Casing Cover
161
Shaft
210
Impeller
230
Deep Groove Ball Bearing
321.01/.02
Mechanical Seal, Complete Versions With Gland Packing
433
Casing Cover
161
Shaft
210
Impeller
230
Deep Groove Ball Bearing
321.01/.02
Mechanical Seal, Complete Versions With Gland Packing
433
Casing Cover
161
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX