MaintainX Asset Hub logo
EnterprisePricing
KSB SE & Co. KGaA

KSB SE & Co. KGaA Standardised Chemical Pump MCPK080-50-200

Need answers fast?
Explore the manual using AI.

KSB SE & Co. KGaA Standardised Chemical Pump MCPK080-50-200
KSB SE & Co. KGaA Standardised Chemical Pump MCPK080-50-200

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for KSB SE & Co. KGaA Standardised Chemical Pump MCPK080-50-200

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

KSB SE & Co. KGaA Standardised Chemical Pump MCPK080-50-200

KSB SE & Co. KGaA Standardised Chemical Pump MCPK080-50-200

Create an account to install this asset package.

Maintenance Plans for KSB SE & Co. KGaA Standardised Chemical Pump Model MCPK080-50-200

Integrate maintenance plans directly into your work orders in MaintainX.

Coupling Inspection

Check mark

Safety Warning

Check mark

Read and understand the danger of excessive temperatures caused by friction, impact, or frictional sparks. Explosion and fire hazard! Damage to the pump set!

Check mark

Inspect Coupling Guard and Components

Check mark

Check the coupling guard for deformation

Check mark

Ensure sufficient distance of plastic components and other guards from rotating parts

Check mark

Inspect Flexible Elements of the Coupling

Check mark

Check the flexible elements of the coupling for signs of wear

Check mark

Replace relevant parts if there is any sign of wear

Check mark

Check the alignment of the coupling

Run this procedureArrow right

Suction Filter Inspection

Check mark

Pre-Inspection Safety

Check mark

Ensure the pump is turned off

Check mark

Verify that the system is depressurized

Check mark

Filter Inspection

Check mark

Record the differential pressure across the filter

Check mark

Is the differential pressure within the acceptable range?

Check mark

Filter Maintenance

Check mark

Is the filter clogged?

Check mark

Clean the filter if necessary

Run this procedureArrow right

The Economy Bearing Assembly Dismantling

Check mark

Observe and carry out notes and steps from Section 7.4.1 to Section 7.4.7

Check mark

Push shaft 210 with deep-groove ball bearing 321.01/.02 out of the bearing bracket

Check mark

Heat up the deep-groove ball bearing to 80°C

Check mark

Pull deep-groove ball bearing off shaft 210

Check mark

Pull deep-groove ball bearing 321.01/.02 off the shaft in cold condition (for grease-lubricated models)

Check mark

Dispose of joint rings 400.01/.02

Run this procedureArrow right

Pump Set Service

Check mark

Safety Precautions

Check mark

Ensure the following safety measures are observed

Check mark

Maintenance Schedule Preparation

Check mark

Include the following in the maintenance schedule

Check mark

Operational Checks

Check mark

Is the pump set serviced regularly?

Check mark

Are all safety precautions in place before starting maintenance?

Check mark

Post-Maintenance Procedures

Check mark

Ensure all parts are reassembled without using force

Run this procedureArrow right

Pump Set Removal

Check mark

Safety Precautions

Check mark

Ensure only qualified personnel perform work on the pump set.

Check mark

Allow the pump set to cool down to ambient temperature.

Check mark

Use suitable transport devices and lifting equipment for heavy components.

Check mark

Preparation

Check mark

Properly shut down the pump set.

Check mark

Close the shut-off elements in suction and discharge line.

Check mark

Drain the pump and release the pump pressure.

Check mark

Close any auxiliary connections.

Run this procedureArrow right

Parts for KSB SE & Co. KGaA Standardised Chemical Pump MCPK080-50-200

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Shaft

210

Impeller

230

Rolling Element Bearing (Set)

320.02

Radial Ball Bearing

321.01

Radial Ball Bearing (1)

321.02

Shaft

210

Impeller

230

Rolling Element Bearing (Set)

320.02

Radial Ball Bearing

321.01

Radial Ball Bearing (1)

321.02

Shaft

210

Impeller

230

Rolling Element Bearing (Set)

320.02

Radial Ball Bearing

321.01

Radial Ball Bearing (1)

321.02

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from KSB SE & Co. KGaA

Explore Other Assets