Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

KSB SE & Co. KGaA Standardised Chemical Pump MCPK050-32-200
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
15000 Hourly / 2 Yearly Grease-Lubricated Bearing Inspection
Initial Inspection
Check for unfavourable operating conditions
Is early inspection required due to unfavourable conditions?
Bearing Inspection and Maintenance
Inspect bearings for wear and tear
Clean the bearings if required
Relubricate the bearings if required
Grease Quality Check
Is the grease quality as per DIN 51825 standards?
The Economy Bearing Assembly Dismantling
Observe and carry out notes and steps from Section 7.4.1 to Section 7.4.7
Push shaft 210 with deep-groove ball bearing 321.01/.02 out of the bearing bracket
Heat up the deep-groove ball bearing to 80°C and pull it off shaft 210
Pull deep-groove ball bearing 321.01/.02 off the shaft in cold condition for grease-lubricated models
Dispose of joint rings 400.01/.02
Rolling Element Bearing Oil Change
Safety Precautions
Wear safety clothing and a protective mask, if required
Ensure a suitable container for the used oil is on hand
Place the container underneath the screw plug
Undo the screw plug at the bearing bracket and drain the oil
Re-insert and re-tighten the screw plug after draining
Re-fill with oil
Collect and dispose of any lubricants
Observe all legal regulations on the disposal of fluids posing a health hazard
Back Pull-Out Unit Removal
WARNING — Back Pull-Out Unit Tipping Over. Risk of crushing hands and feet!
Suspend or support the bearing bracket at the pump end
Suspend or support bearing bracket 330 to prevent it from tipping over, if required
Unbolt support foot 183 from the baseplate
Undo hexagon nut 920.01 at the volute casing
Pull the back pull-out unit out of the volute casing
Remove and dispose of joint ring 411.10
Place the back pull-out unit on a clean and level surface
Pump Set Check
Lubrication and Bearings Check
Check the lubricant level regularly.
Check the rolling element bearings for running noises.
Shaft Seal and Barrier Fluid System
Service the shaft seal regularly.
Service the barrier fluid system regularly.
Monitor the barrier fluid pressure.
Operational Safety Checks
Ensure the pump set is not operated without liquid fill.
Access the parts list for your equipment in MaintainX.
Shaft
210
Impeller
230
Rolling Element Bearing (Set)
320.02
Radial Ball Bearing
321.01
Radial Ball Bearing (1)
321.02
Shaft
210
Impeller
230
Rolling Element Bearing (Set)
320.02
Radial Ball Bearing
321.01
Radial Ball Bearing (1)
321.02
Shaft
210
Impeller
230
Rolling Element Bearing (Set)
320.02
Radial Ball Bearing
321.01
Radial Ball Bearing (1)
321.02
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX