MaintainX Logo
EnterprisePricing
JCB

JCB JCB Backhoe Loader 3CX 2 3CX 2

Need answers fast?
Explore the manual using AI.

JCB JCB Backhoe Loader 3CX 2 3CX 2
JCB JCB Backhoe Loader 3CX 2 3CX 2

The JCB Backhoe Loader 3CX 2 is a versatile and powerful machine designed for construction and excavation tasks. Known for its durability and efficiency, this backhoe loader excels in various applications, making it an essential asset for any heavy equipment fleet. Experience reliable performance and ease of maintenance with JCB's industry-leading technology.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for JCB JCB Backhoe Loader 3CX 2 3CX 2

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

JCB JCB Backhoe Loader 3CX 2 3CX 2

JCB JCB Backhoe Loader 3CX 2 3CX 2

Create an account to install this asset package.

Maintenance Plans for JCB JCB Backhoe Loader 3CX 2 Model 3CX 2

Integrate maintenance plans directly into your work orders in MaintainX.

1000 Hours / 1 Yeary Loader Engine Maintenance

Check mark

- Change Engine Oil and Filter (AK and AR Build)

Check mark

- Change Engine Oil and Filter (RE and RG Build)

Check mark

- Change Engine Air Cleaner Outer Element

Check mark

- Change Engine Fuel Filter (AK and AR Build)

Check mark

- Change Engine Fuel Filter (RE and RG Build)

Check mark

- Clean Lift Pump Strainer (AK and AR Build Only)

Check mark

- Check Coolant Quality/Level

Check mark

- Drain and Clean Engine Fuel Sedimenter

Check mark

- Check Fan Belt Tension/Condition

Run this procedureArrow right

Loader Cleaning

Check mark

Park the machine on firm level ground, engage the parking brake and set the transmission to neutral. Lower the attachments to the ground and stop the engine

Check mark

Machine parked and prepared for cleaning?

Check mark

Clean the machine using water and/or steam. Do not allow mud, debris etc to build upon the machine, pay particular attention to the following areas:

Check mark

Areas cleaned

Check mark

Stabiliser cavities cleaned and free from debris?

Check mark

Engine and transmission free from mud build up?

Check mark

Radiator grille not clogged up?

Check mark

WARNING! Airborne particles of light combustible material such as straw, grass, wood shavings, etc. must not be allowed to accumulate within the engine compartment or in the propshaft guards (when fitted). Please inspect these areas frequently and clean at the beginning of each work shift or more often if required. Before opening the engine cover, ensure that the top is clear of debris

Check mark

Engine compartment and propshaft guards free from light combustible material?

Run this procedureArrow right

1000 Hours / 1 Yeary Loader Transmission Maintenance

Check mark

Change Transmission Oil

Check mark

Change Transmission Filter

Check mark

Change Axle Oil (incl. Hubs when applicable)

Check mark

Change Axle Oil - Limited Slip Differential

Check mark

Check Tyre Pressures/Condition

Check mark

Check Front Hub Bearings

Check mark

Clean Transmission Strainer

Check mark

Security/Grease Drive Shafts

Check mark

Check Steer Axle Movement/Shimming

Run this procedureArrow right

2000 Hours / 2 Yeary Loader Engine Maintenance

Check mark

- Change Engine Oil and Filter (AK and AR Build)

Check mark

- Change Engine Oil and Filter (RE and RG Build)

Check mark

- Change Engine Air Cleaner Outer Element

Check mark

- Change Air Cleaner Inner Element

Check mark

- Change Engine Fuel Filter (AK and AR Build)

Check mark

- Change Engine Fuel Filter (RE and RG Build)

Check mark

- Clean Lift Pump Strainer (AK and AR Build Only)

Check mark

- Check Coolant Quality/Level

Check mark

- Drain and Clean Engine Fuel Sedimenter

Run this procedureArrow right

Loader Check

Check mark

Inspect steelwork for damage

Check mark

Note damaged paintwork for future repair

Check mark

All pivot pins are correctly in place and secured by their locking devices

Check mark

Steps and handrails are undamaged and secure

Check mark

No broken or cracked window glass

Check mark

Upload a photo of replaced items

Check mark

All bucket teeth are undamaged and secure

Check mark

All lamp lenses are undamaged

Check mark

Tyres are undamaged and free from penetration by sharp objects

Run this procedureArrow right

Parts for JCB JCB Backhoe Loader 3CX 2 3CX 2

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Bonded Washer, 1/2 in. BSP

1406/0018

Flow Test Adapter

460/15708

Banjo Bolt

460/15707

Threadseal, 50ml, A Medium Strength Thread Sealing Compound

4102/1951

Bonded Washer, 1/4 in. BSP

1406/0011

Bonded Washer, 1/2 in. BSP

1406/0018

Flow Test Adapter

460/15708

Banjo Bolt

460/15707

Threadseal, 50ml, A Medium Strength Thread Sealing Compound

4102/1951

Bonded Washer, 1/4 in. BSP

1406/0011

Bonded Washer, 1/2 in. BSP

1406/0018

Flow Test Adapter

460/15708

Banjo Bolt

460/15707

Threadseal, 50ml, A Medium Strength Thread Sealing Compound

4102/1951

Bonded Washer, 1/4 in. BSP

1406/0011

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from JCB

Explore Other Assets