Trane CenTraVac™ Water-Cooled Chiller CVHE - 230-320 - 233 - 032S / 032S

Need answers fast?
Explore the manual using AI.

Trane CenTraVac™ Water-Cooled Chiller CVHE - 230-320 - 233 - 032S / 032S
Trane CenTraVac™ Water-Cooled Chiller CVHE - 230-320 - 233 - 032S / 032S

The Trane CenTraVac™ Water-Cooled Chiller CVHE - 230-320 - 233 - 032S / 032S is a high-efficiency cooling solution designed for industrial applications. Known for its reliability and performance, this chiller model provides optimal temperature control while minimizing energy consumption. Ideal for large facilities, it ensures consistent operation and longevity.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Trane CenTraVac™ Water-Cooled Chiller CVHE - 230-320 - 233 - 032S / 032S

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Trane CenTraVac™ Water-Cooled Chiller CVHE - 230-320 - 233 - 032S / 032S

Trane CenTraVac™ Water-Cooled Chiller CVHE - 230-320 - 233 - 032S / 032S

Create an account to install this asset package.

Maintenance Plans for Trane CenTraVac™ Water-Cooled Chiller Model CVHE - 230-320 - 233 - 032S / 032S

Integrate maintenance plans directly into your work orders in MaintainX.

1 Yearly Exterior Parts Maintenance

Check mark

Chiller shut down?

Check mark

Inlet guide vane linkage checked?

Check mark

Painted surfaces cleaned and touched-up as needed?

Check mark

Deteriorated, torn, or missing insulation repaired?

Run this procedureArrow right

3 Yearly Tubes Maintenance

Check mark

Use a non-destructive tube test to inspect the condenser and evaporator tubes

Check mark

Tube test performed on condenser and evaporator tubes?

Check mark

It may be desirable to perform tube tests on these components at more frequent intervals depending upon chiller application

Check mark

This is especially true of critical process equipment

Check mark

Ask your Sales account manager for a copy of engineering bulletin (CTV-PRB024*-EN) for clarification of the role of eddy current testing in chiller maintenance by providing information about eddy current technology and heat exchanger tubing

Check mark

Sign off on the tube maintenance

Run this procedureArrow right

1 Yearly Purge Unit Inspection

Check mark

Shut down the chiller

Check mark

Upload the purge Installation, Operation, and Maintenance manual

Check mark

Follow maintenance and/or inspection items identified in the manual

Check mark

Enter purge pump-out data

Check mark

Review overall operation of purge

Check mark

Service notes if necessary

Check mark

Sign off on the purge unit inspection

Run this procedureArrow right

2 Monthly Sacrificial Anodes Replacement

Check mark

Warning: Equipment Damage! Failure to follow instructions could result in equipment damage

Check mark

Do NOT use Teflon-based tape or paste on anode; a small amount of liquid sealant (Loctite® 242 or equivalent) may be applied to prevent leakage when installing an anode, but do not apply so much sealant that it prevents the necessary electrical connection between the anode and the waterbox

Check mark

Inspection of anodes for wear within the first several months of the anodes being placed into service

Check mark

Enter the observed loss of anode material

Check mark

Anode has lost 50 percent or more of its original mass

Check mark

If anode depletion occurs very quickly, was a water treatment specialist consulted?

Check mark

Upload a photo of the anode after inspection

Check mark

Sign off on the anode inspection and replacement

Run this procedureArrow right

Initial 1 Month Waterbox Maintenance

Check mark

Trane recommends that coated waterboxes/tubesheets - regardless of the type of protective coating included - be taken out of service within the first one to three months of operation for inspection.

Check mark

Any voids or defects identified upon inspection?

Check mark

If voids or defects are identified, they must be repaired.

Check mark

Is the water quality known to be highly supportive of corrosion (i.e., sea water, etc.)?

Check mark

If yes, inspect the coating system at one month.

Check mark

Is the water quality known to be relatively benign (i.e., normal treated and clean condenser water)?

Check mark

If yes, inspect the coating system within three months.

Check mark

Did the initial inspections show no problems?

Check mark

Only when initial inspections show no problems are present should subsequent maintenance intervals be increased.

Run this procedureArrow right

Parts for Trane CenTraVac™ Water-Cooled Chiller CVHE - 230-320 - 233 - 032S / 032S

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Evap Lifting Fixture, CTV Unit

BAR00400

Safety Hoist Ring 1/2-13, CTV Unit

RNG01885

Safety Hoist Ring 3/4-10, CTV Unit

RNG01884

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Trane

Explore Other Assets