

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Intelligent Actuator Tabletop Robot TTA-A2
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
12 Monthly Axes Lubrication
8.5.2 Period of Time to Supply Grease
Reference period of time to supply grease based on speed
Is the grease supply period based on operation distance or months reached earlier?
8.5.3 How to Supply the Grease
Use Idemitsu Kosan Daphne Grease MP No.2 or equivalent
Examples of equivalent grease products
Ensure no fluorine-based grease is used
Detach the grommet
Move the slider to expose the grease nipple
Initial 3 Months Axes Lubrication
Period of Time to Supply Grease
Supply grease once in 3 months after the start of first operation after delivery
How to Supply the Grease on X, Y, and Z Axes
Select the grease to be used
Ensure no fluorine-based grease is used
General Grease Supply Procedure
Detach the grommet
Move the slider until the grease nipple on the slider is visible
Insert the grease gun into the grease supply inlet and supply grease on the grease nipple
6 Monthly Visual Inspection
8.1 Inspection Items and Schedule
Confirm inspection intervals based on actuator utilization
Record the current inspection interval
8.2 External visual inspection
Check for loose actuator mounting bolts and other loose items on the main unit
Inspect cables for scratches and proper connections
Check for irregular noise and vibration
8.1 Inspection Items and Schedule
Confirm internal inspection schedule
3 Yearly Fan Replacement
8.7.1 Period of Time
Recommended fan replacement period
8.7.2 Preparation
Ensure you have a Phillips screwdriver
Ensure you have the replacement fan unit
Verify fan unit model code
8.7.3 Replacement procedure
Remove the screws on the rear panel at the back of the main unit
Slide the rear panel slightly towards you
Timing Belt Inspection
8.6.1 Inspecting the Belt
Remove the pulley cover and visually inspect the belt
Check for obvious friction in the gear and belt area
Check for swelling due to oil adhesion
Inspect for cracks on the belt gear and back side
Check if the belt is broken
Contact IAI if the belt needs replacement
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













