MaintainX, an Autodesk company
EnterprisePricing
Intelligent Actuator

Intelligent Actuator Tabletop Robot TTA-A4SL

Need answers fast?
Explore the manual using AI.

Intelligent Actuator Tabletop Robot TTA-A4SL
Intelligent Actuator Tabletop Robot TTA-A4SL

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Intelligent Actuator Tabletop Robot TTA-A4SL

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Intelligent Actuator Tabletop Robot TTA-A4SL

Intelligent Actuator Tabletop Robot TTA-A4SL

Create an account to install this asset package.

Maintenance Plans for Intelligent Actuator Tabletop Robot Model TTA-A4SL

Integrate maintenance plans directly into your work orders in MaintainX.

6 Monthly Axis Lubrication

Check mark

8.5.2 Period of Time to Supply Grease

Check mark

Supply grease to the R-axis every 6 months

Check mark

Ensure no fluorine-based grease is used

Check mark

8.5.3 How to Supply the Grease — Procedures to Supply Grease on ZR Axis

Check mark

Required Tool

Check mark

Take out the rubber cap on the bottom of the side of the ZR-axis

Check mark

Confirm the grease nipple while the R-axis is at the home-position (Position 0)

Check mark

Supply grease using a grease gun while the R-axis is at home-position (Position 0)

Check mark

Hold the ZR-axis or turn the servo on during grease supply

Run this procedureArrow right

Post-Storage Lubrication

Check mark

8.5.2 Period of Time to Supply Grease

Check mark

Has the equipment been stored for 6 months or more?

Check mark

Check if the existing grease is degraded.

Check mark

Supply grease to the following axes

Check mark

Use Idemitsu Kosan Daphne Grease MP No.2 or equivalent (e.g. Showa Shell Oil Albania Grease No. 2, Mobil Oil Mobilux 2)

Run this procedureArrow right

Timing Belt Inspection

Check mark

8.6.1 Inspecting the Belt

Check mark

Remove the pulley cover and visually inspect the belt

Check mark

Check for obvious friction in the gear and belt area

Check mark

Check for swelling due to oil adhesion

Check mark

Inspect for cracks on the belt gear and back side

Check mark

Check if the belt is broken

Check mark

Contact IAI if the belt needs replacement

Run this procedureArrow right

3 Yearly Fan Replacement

Check mark

8.7.1 Period of Time

Check mark

Confirm fan replacement is due after approximately three years of 24-hour operation in 40°C

Check mark

8.7.2 Preparation

Check mark

Gather required tools and replacement parts

Check mark

8.7.3 Replacement procedure

Check mark

Remove the screws on the rear panel at the back of the main unit

Check mark

Slide the rear panel slightly towards you

Check mark

Remove the screws on the module plate

Check mark

Take off the connector equipped on the fan unit

Run this procedureArrow right

6 Monthly Visual Inspection

Check mark

8.1 Inspection Items and Schedule

Check mark

Adjust inspection intervals based on actuator utilization

Check mark

8.2 External Visual Inspection

Check mark

Check the main unit for issues

Check mark

Inspect cables

Check mark

Overall inspection

Check mark

8.1 Inspection Items and Schedule

Check mark

Schedule internal inspection every 6 months

Check mark

8.3 Internal Visual Inspection

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Intelligent Actuator

Explore Other Assets