

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Intelligent Actuator Tabletop Robot TTA-A4SH
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
6 Monthly Visual Inspection
8.1 Inspection Items and Schedule
Adjust inspection intervals based on actuator utilization
8.2 External Visual Inspection
Check the main unit for issues
Inspect cables
Overall inspection
8.1 Inspection Items and Schedule
Schedule internal inspection every 6 months
8.3 Internal Visual Inspection
12 Monthly Axes Lubrication
8.5.2 Period of Time to Supply Grease
Reference period of time to supply grease based on speed
Is the grease supply period determined by the operation distance or number of months reached earlier?
8.5.3 How to Supply the Grease
Use Idemitsu Kosan Daphne Grease MP No.2 or equivalent
Equivalent grease options
Ensure no fluorine-based grease is used
Detach the grommet
Move the slider to expose the grease nipple
6 Monthly Axis Lubrication
8.5.2 Period of Time to Supply Grease
Supply grease to the R-axis every 6 months
Ensure no fluorine-based grease is used
8.5.3 How to Supply the Grease — Procedures to Supply Grease on ZR Axis
Required Tools
Take out the rubber cap on the bottom of the side of the ZR-axis
Confirm the grease nipple while the R-axis is at the home-position (Position 0)
Supply grease using a grease gun while the R-axis is at home-position (Position 0)
Hold the ZR-axis or turn the servo on during grease supply
Post-Storage Lubrication
Period of Time to Supply Grease
Check if the equipment has been stored for 6 months or more
Supply grease to X, Y, and Z Axes
Supply grease to ZR Axis
Verify the type of grease used
3 Yearly Fan Replacement
8.7.1 Period of Time
Recommended fan replacement period
8.7.2 Preparation
Ensure you have a Phillips screwdriver
Ensure you have the replacement fan unit
Verify fan unit model code
8.7.3 Replacement procedure
Remove the screws on the rear panel at the back of the main unit
Slide the rear panel slightly towards you
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













