Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Gardner Denver Screw Air Compressor L55-75D
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
8 Hourly Air Compressor Check
Safety Precautions
Ensure the compressor is not powered before starting maintenance.
For L55RS-L75RS models, confirm the system is disconnected from the mains and wait 10 minutes before touching electrical components.
Press the STOP button on the control panel and wait until the compressor stops and is depressurized.
Verify the pressure gauge shows no more than 4.4 PSI.
Relieve the compressor unit by slowly opening the screw plug with integrated air vent slots.
Set the on-site main switch to '0' (OFF) and secure it against being switched on.
Operational Checks
Check air/oil reservoir oil level and add oil if required.
Initial 10 Years Pressure Reservoir Test
Pre-Test Preparations
Ensure the reservoir is completely drained
Verify all safety valves are operational
Check that all necessary equipment is available
Strength Test Execution
Record the initial pressure reading
Is the pressure within the acceptable range before testing?
Conduct the strength test as per 97/23/EC guidelines
Post-Test Procedures
6 Monthly / 2000 Hourly Air Compressor Maintenance
Replace filter elements
Take oil sample
Replace filters if applicable
Visually check for leakage at shaft seal
Air Compressor Fine Oil Separator Change
Safety Precautions
Shut down the compressor and relieve the system of all pressure.
Disconnect, lockout, and tagout the power supply to the compressor package.
Oil Handling Precautions
Ensure no oil is spilled during the procedure.
Check for leaks and address any spilled oil immediately.
Separator Replacement Procedure
Switch off the compressor and ensure it is depressurized by opening the ball valve at the after-cooler.
Detach the plastic oil extraction pipe.
36 Monthly / 12000 Hourly Air Compressor Maintenance
Replace filter elements
Take oil sample
Replace lubricant
Replace air/oil separator
Inspect and service components
Inspect and clean scavenge line, replace check valve if necessary
Inspect and service inlet valve if necessary
Inspect and re-grease motor bearings if necessary
Inspect and replace drive belts if necessary (if applicable)
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX