Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Miura Steam Boiler LX-50
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Daily Chemical Feed Check
Warning!
Checking the Chemical Feeder
Confirm that the chemical feed is as required.
Confirm that sufficient liquid is present to properly dissolve chemicals.
Confirm that there is no air in the chemical feed pump or feed line.
Warning!
1 Daily Low Water Level Interlock Test
Warning!
Low Water Level Interlock Test
Open the ball valve at the bottom of the LVC to test the Low Water Volume Cut-off.
Allow time for the steam pressure to force the water out of the LVC.
Did the low water cut-off probe lose contact with the water for more than 15 seconds?
Did the boiler shift to stand-by mode and shut down after 15 seconds?
Did the alarm sound and the BL11 Microcomputer display 'WATER ALARM 1'?
Steam Boiler Blowdown
Warning!
Warning!
Warning!
Warning!
Warning!
Pre-Blowdown Checks
Confirm that the boiler has been shutdown.
Is the steam pressure gauge reading 30 PSI?
Blowdown Procedure
4 Monthly Feed-water Tank Interior Cleaning
Warning!
WARNING!
Cleaning the Feed-water Tank
Turn off the breaker for the boiler’s main power.
Confirm that the steam pressure gauge is reading 0 PSI.
Is the steam pressure gauge reading 0 PSI?
Close the main makeup valve.
Open the blowdown valve for the feed water tank.
When the discharge of water ends, close the feed water tank’s blowdown valve.
1 Daily Steam Boiler Maintenance
Warning!
Chemical Feed Pump
Check for proper chemical feed.
Ensure there is no air in the chemical feed pump or lines.
Water Softener
Verify boiler make-up water is completely soft using a test kit sensitive to less than 1.0 PPM.
Ensure the water softener timer or softener flow meter is working.
Check valve positions
Check for hardening (caking) of the salt in the brine tank and break the salt into small pieces if necessary.
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX