Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Miura Steam Boiler LXH-300
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Daily Water Test
Warning!
Daily Water Test Procedure
Record the water hardness level
Record the pH level of the water
Record the conductivity of the water
Log any anomalies or issues observed during the test
1 Daily Water Softness Check
Warning!
Preparation for Sampling
Rapidly discharge approximately two liters of water from the water sampling port.
Thoroughly wash the sampling beaker with the sample water.
Water Hardness Test
Add four drops of hardness indicator to the sampling beaker.
Add approximately 20 mL of sample water and agitate well to mix.
Fill the sampling beaker up to the 50-mL level by collecting more sample water.
Determine the water hardness based on the color of the solution in the sampling beaker.
4 Monthly Feed-water Tank Interior Cleaning
Safety Precautions
Ensure no work other than indicated is carried out on the boiler.
Confirm water in supply lines has cooled down sufficiently (at least two hours after boiler shutdown).
Preparation
Turn off the breaker for the boiler’s main power.
Confirm that the steam pressure gauge is reading 0 PSI.
Valve Operations
Close the main makeup valve.
Open the blowdown valve for the feed water tank.
1 Yearly Safety Valve Inspection
Warning!
WARNING!
Safety Valve Inspection
Record the safety valve's release pressure
Is the safety valve's release pressure within the acceptable range?
Inspect the safety valve for any signs of leakage or abnormality
Is there any sign of leakage or abnormality?
Post Inspection
Contact MIURA sales office or local dealer if leakage or abnormality is suspected
1 Daily Steam Boiler Maintenance
Warning!
Chemical Feed Pump
Check for proper chemical feed.
Ensure there is no air in the chemical feed pump or lines.
Water Softener
Verify boiler make-up water is completely soft using a test kit sensitive to less than 1.0 PPM.
Ensure the water softener timer or softener flow meter is working.
Check valve positions
Check for hardening (caking) of the salt in the brine tank and break the salt into small pieces if necessary.
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX