MaintainX, an Autodesk company
EnterprisePricing
Miura

Miura Steam Boiler LX-150

Need answers fast?
Explore the manual using AI.

Miura Steam Boiler LX-150
Miura Steam Boiler LX-150

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Miura Steam Boiler LX-150

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Miura Steam Boiler LX-150

Miura Steam Boiler LX-150

Create an account to install this asset package.

Maintenance Plans for Miura Steam Boiler Model LX-150

Integrate maintenance plans directly into your work orders in MaintainX.

4 Monthly Feed-water Strainer Cleaning

Check mark

Safety Precautions

Check mark

Ensure no work other than specified is carried out on the boiler.

Check mark

Confirm boiler water supply lines have cooled down for at least two hours after shutdown.

Check mark

Initial Setup

Check mark

Turn off the breaker for the boiler’s main power.

Check mark

Confirm the steam pressure gauge reads 0 PSI.

Check mark

Valve Operations

Check mark

Is the main feed water valve closed?

Check mark

Open the boiler blowdown valve.

Run this procedureArrow right

1 Daily Low Water Level Interlock Test

Check mark

Warning!

Check mark

Low Water Level Interlock Test

Check mark

Open the ball valve at the bottom of the LVC to test the Low Water Volume Cut-off.

Check mark

Allow time for the steam pressure to force the water out of the LVC.

Check mark

Did the low water cut-off probe lose contact with the water for more than 15 seconds?

Check mark

Did the boiler shift to stand-by mode and shut down after 15 seconds?

Check mark

Did the alarm sound and the BL11 Microcomputer display 'WATER ALARM 1'?

Run this procedureArrow right

1 Daily Water Test

Check mark

Warning!

Check mark

Daily Water Test Procedure

Check mark

Record the water hardness level

Check mark

Record the pH level of the water

Check mark

Record the conductivity of the water

Check mark

Is the water quality within the acceptable range?

Check mark

Post-Test Actions

Check mark

Log any anomalies or issues found during the test

Check mark

Technician's signature

Run this procedureArrow right

1 Yearly UV Sensor Protective Glass Cleaning

Check mark

Warning!

Check mark

WARNING!

Check mark

Instruction Requirement

Check mark

Preparation

Check mark

Have you received instruction from MIURA maintenance personnel?

Check mark

Is the boiler sufficiently cooled down?

Check mark

Power Safety

Check mark

Turn off the breaker for the boiler’s main power.

Check mark

WARNING!

Run this procedureArrow right

4 Monthly Water Quality Check

Check mark

Warning!

Check mark

Water Test

Check mark

Conduct a full water test for all water types

Check mark

Record the test results

Check mark

Are the test results within the WATER TREATMENT GUIDELINES FOR MIURA STEAM BOILERS?

Check mark

Actions taken if results are outside guidelines

Check mark

Consultation

Check mark

Have you referred to your contract terms and conditions or Miura representative for the frequency of a full water test?

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Miura

Explore Other Assets