

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Miura Steam Boiler LX-150
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
4 Monthly Feed-water Strainer Cleaning
Safety Precautions
Ensure no work other than specified is carried out on the boiler.
Confirm boiler water supply lines have cooled down for at least two hours after shutdown.
Initial Setup
Turn off the breaker for the boiler’s main power.
Confirm the steam pressure gauge reads 0 PSI.
Valve Operations
Is the main feed water valve closed?
Open the boiler blowdown valve.
1 Daily Low Water Level Interlock Test
Warning!
Low Water Level Interlock Test
Open the ball valve at the bottom of the LVC to test the Low Water Volume Cut-off.
Allow time for the steam pressure to force the water out of the LVC.
Did the low water cut-off probe lose contact with the water for more than 15 seconds?
Did the boiler shift to stand-by mode and shut down after 15 seconds?
Did the alarm sound and the BL11 Microcomputer display 'WATER ALARM 1'?
1 Daily Water Test
Warning!
Daily Water Test Procedure
Record the water hardness level
Record the pH level of the water
Record the conductivity of the water
Is the water quality within the acceptable range?
Post-Test Actions
Log any anomalies or issues found during the test
Technician's signature
1 Yearly UV Sensor Protective Glass Cleaning
Warning!
WARNING!
Instruction Requirement
Preparation
Have you received instruction from MIURA maintenance personnel?
Is the boiler sufficiently cooled down?
Power Safety
Turn off the breaker for the boiler’s main power.
WARNING!
4 Monthly Water Quality Check
Warning!
Water Test
Conduct a full water test for all water types
Record the test results
Are the test results within the WATER TREATMENT GUIDELINES FOR MIURA STEAM BOILERS?
Actions taken if results are outside guidelines
Consultation
Have you referred to your contract terms and conditions or Miura representative for the frequency of a full water test?
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













