PDF MANUAL

Manual for Miura Steam Boiler LXH-200

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Miura Steam Boiler LXH-200

Miura Steam Boiler LXH-200

Create an account to install this asset package.

Maintenance Plans for Miura Steam Boiler Model LXH-200

Integrate maintenance plans directly into your work orders in MaintainX.

4 Monthly Safety Sensors Check

Check mark

Safety Precautions

Check mark

Ensure no work other than indicated is carried out on the boiler.

Check mark

Allow sufficient time for the boiler to cool down before starting work.

Check mark

Receive instruction from MIURA maintenance personnel for cleaning the UV sensor’s protective glass.

Check mark

Boiler Power Shutdown

Check mark

Turn off the breaker for the boiler’s main power.

Check mark

UV Sensor Maintenance

Check mark

Extract the UV sensor.

Check mark

Remove the mounting screws from the phototube base.

Run this procedureArrow right

1 Daily Steam Pressure Check

Check mark

Boiler Startup

Check mark

Startup the boiler as described in Section 8.1: Boiler Startup

Check mark

Steam Pressure Check

Check mark

Enter the reading on the steam pressure gauge

Check mark

Is the steam pressure within the normal range?

Check mark

Is the gauge pointer stable?

Check mark

Warnings

Check mark

Acknowledge that no work other than that clearly indicated is to be carried out on the boiler

Check mark

Acknowledge the warning about abnormal steam pressure levels

Run this procedureArrow right

4 Monthly Feed-water Tank Interior Cleaning

Check mark

Safety Precautions

Check mark

Ensure no work other than indicated is carried out on the boiler

Check mark

Confirm water in supply lines has cooled down (at least two hours after boiler shutdown)

Check mark

Preparation

Check mark

Turn off the breaker for the boiler’s main power

Check mark

Confirm that the steam pressure gauge is reading 0 PSI

Check mark

Valve Operations

Check mark

Close the main makeup valve

Check mark

Open the blowdown valve for the feed water tank

Run this procedureArrow right

1 Daily Steam Boiler Maintenance

Check mark

Warning!

Check mark

Chemical Feed Pump

Check mark

Check for proper chemical feed.

Check mark

Ensure there is no air in the chemical feed pump or lines.

Check mark

Water Softener

Check mark

Verify boiler make-up water is completely soft (use a test kit sensitive to less than 1.0 PPM).

Check mark

Ensure the water softener timer or softener flow meter is working.

Check mark

Confirm the by-pass valve is closed and inlet and outlet valves are open.

Check mark

Check for hardening (caking) of the salt in the brine tank and break the salt into small pieces if necessary.

Run this procedureArrow right

1 Daily Water Test

Check mark

Warning!

Check mark

Water Test Procedure

Check mark

Record the water hardness level

Check mark

Record the pH level of the water

Check mark

Record the conductivity of the water

Check mark

Is the water quality within the acceptable range?

Check mark

Post Test Actions

Check mark

Log any deviations or issues found during the test

Check mark

Technician's signature

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.