MaintainX Asset Hub logo
EnterprisePricing
BRYANT

BRYANT Gas Heat Rooftop Package 581JE24D

Need answers fast?
Explore the manual using AI.

BRYANT Gas Heat Rooftop Package 581JE24D
BRYANT Gas Heat Rooftop Package 581JE24D

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for BRYANT Gas Heat Rooftop Package 581JE24D

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

BRYANT Gas Heat Rooftop Package 581JE24D

BRYANT Gas Heat Rooftop Package 581JE24D

Create an account to install this asset package.

Maintenance Plans for BRYANT Gas Heat Rooftop Package Model 581JE24D

Integrate maintenance plans directly into your work orders in MaintainX.

Controller Alarm Test

Check mark

Controller Alarm Test Procedure

Check mark

Press the controller’s test/reset switch for seven seconds.

Check mark

Verify that the controller’s Alarm LED turns on.

Check mark

Reset the sensor by pressing the test/reset switch for two seconds.

Check mark

Verify that the controller’s Alarm LED turns off.

Check mark

Post-Test Verification

Check mark

Is the controller functioning as expected after the test?

Check mark

Describe any issues encountered during the test.

Check mark

Completion

Run this procedureArrow right

SD−TRK4 Remote Alarm Test

Check mark

Turn the key switch to the RESET/TEST position for seven seconds

Check mark

Verify that the test/reset station’s Alarm LED turns on

Check mark

Reset the sensor by turning the key switch to the RESET/TEST position for two seconds

Check mark

Verify that the test/reset station’s Alarm LED turns off

Run this procedureArrow right

3 Monthly Package Inspection

Check mark

Filter Maintenance

Check mark

Return air filter replacement completed

Check mark

Outdoor hood inlet filters cleaned

Check mark

Belt and Pulley Inspection

Check mark

Belt tension checked

Check mark

Belt condition checked

Check mark

Pulley alignment checked

Check mark

Fan and Bearing Inspection

Check mark

Fan shaft bearing locking collar tightness checked

Run this procedureArrow right

Motor Replacement

Check mark

Preparation

Check mark

Turn off all electrical power to the unit and use approved lockout/tagout procedures on all electrical power sources.

Check mark

Motor Removal

Check mark

Remove the cover on the motor connection box.

Check mark

Disconnect all electrical leads to the motor.

Check mark

Loosen the two jack bolt jamnuts on the motor mounting bracket.

Check mark

Turn the two jack bolts counterclockwise until the motor assembly moves closer to the blower pulley.

Check mark

Remove the V-belt from the blower pulley and motor pulley.

Check mark

Loosen the four mounting bracket bolts and lock washers.

Run this procedureArrow right

Filter Drier Replacement

Check mark

Recover all refrigerant from the system using a Puron (R410) gauge set

Check mark

Remove the filter drier from the line using a tubing cutter

Check mark

Do not use a torch to remove the old filter drier

Check mark

Sweat a new replacement filter drier into the refrigerant line

Check mark

Re-charge the refrigerant system

Check mark

Check that all tools are accounted for

Check mark

Verify system is operating correctly after replacement

Check mark

Describe any issues encountered during the procedure

Run this procedureArrow right

Parts for BRYANT Gas Heat Rooftop Package 581JE24D

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Totaline Coil Cleaner (1-Gallon)

P902-0301

Totaline Coil Cleaner (5-Gallon)

P902-0305

High Flow Valve Service Tool

P920-0010

ORIFICE DRILL #30

LH32RF129

ORIFICE DRILL 1/8

LH32RF125

Totaline Coil Cleaner (1-Gallon)

P902-0301

Totaline Coil Cleaner (5-Gallon)

P902-0305

High Flow Valve Service Tool

P920-0010

ORIFICE DRILL #30

LH32RF129

ORIFICE DRILL 1/8

LH32RF125

Totaline Coil Cleaner (1-Gallon)

P902-0301

Totaline Coil Cleaner (5-Gallon)

P902-0305

High Flow Valve Service Tool

P920-0010

ORIFICE DRILL #30

LH32RF129

ORIFICE DRILL 1/8

LH32RF125

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from BRYANT

Explore Other Assets