Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

BRYANT Gas Heat Rooftop Package 581JE20M
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Sensor Alarm Test
Sensor Alarm Test Procedure
Hold the test magnet where indicated on the side of the sensor housing for seven seconds.
Verify that the sensor’s Alarm LED turns on.
Reset the sensor by holding the test magnet against the sensor housing for two seconds.
Verify that the sensor’s Alarm LED turns off.
Post-Test Verification
Is the sensor functioning as expected after the test?
Describe any issues encountered during the test.
Completion
6 Monthly Air Conditioning Check
Air Conditioning Inspection
Check the tightness of mounting bolts
Verify condenser fan blade positioning
Inspect control box cleanliness and wiring condition
Check wire terminal tightness
Measure refrigerant charge level
Clean evaporator coil
Record evaporator blower motor amperage
6 Monthly Heating Check
Heating System Inspection
Check the following components for cleanliness and condition
Measure the gas manifold pressure
Record the heating temperature rise
Post Inspection
Is the heating system operating within normal parameters?
Describe any issues found during the inspection
Condenser-Fan Adjusting
Preparation
Shut off the unit power supply
Apply the appropriate lockout/tagout procedures
Fan Assembly Removal
Remove the condenser-fan assembly (grille, motor, and fan)
Fan Adjustment
Loosen the fan hub setscrews
Adjust the fan height
Tighten the setscrews
Unit Check
Preparation
Shut off all electrical power supply to the unit and install a lockout tag.
Close the manual gas shutoff valve located on the gas supply line.
Pressure Measurement Setup
Remove the manifold pressure tap plug from the manifold and connect a pressure gauge or manometer.
Turn on the electrical supply.
Open the manual shutoff valve, then turn on the unit main gas valve.
High Stage Heat Operation
Set the room thermostat to call for heat.
Access the parts list for your equipment in MaintainX.
Totaline Coil Cleaner (1-Gallon)
P902-0301
Totaline Coil Cleaner (5-Gallon)
P902-0305
High Flow Valve Service Tool
P920-0010
ORIFICE DRILL #30
LH32RF129
ORIFICE DRILL 1/8
LH32RF125
Totaline Coil Cleaner (1-Gallon)
P902-0301
Totaline Coil Cleaner (5-Gallon)
P902-0305
High Flow Valve Service Tool
P920-0010
ORIFICE DRILL #30
LH32RF129
ORIFICE DRILL 1/8
LH32RF125
Totaline Coil Cleaner (1-Gallon)
P902-0301
Totaline Coil Cleaner (5-Gallon)
P902-0305
High Flow Valve Service Tool
P920-0010
ORIFICE DRILL #30
LH32RF129
ORIFICE DRILL 1/8
LH32RF125
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX