

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Xylem Pump HL150M
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Monthly Trailer Maintenance
Brake Inspection and Adjustment
Check the brakes
Adjust the brakes as necessary
Refer to the service manual for brake adjustment
Wheel Hub Inspection
Check the wheel hubs for side play
Replace any damaged components
Initial 200 Hours Gearbox Maintenance
Oil Maintenance
Drain the oil from the gearbox
Refill with the correct grade of oil
Post Maintenance Checks
Check for any oil leaks after refilling
Ensure the gearbox is operating smoothly
Documentation
Record the type and grade of oil used
Technician's signature
5000 Hourly Pump Maintenance
Mechanical Seal Inspection
Inspect the mechanical seal for excessive wear and damage.
Was the mechanical seal replaced?
Bearings Inspection
Inspect the bearings for excessive wear and damage.
Were the bearings replaced?
Impeller and Wear Plates Clearance Check
Measure the clearance between the impeller and the front wear plate.
Measure the clearance between the impeller and the rear wear plate.
1000 Hourly Vacuum Pump Maintenance
Vacuum Pump Oil Change
Change the vacuum pump oil
Refer to Technical Reference on page 49 for recommended vacuum pump oil
Exhaust Smoke Eliminator Filter Replacement
Measure the back pressure
Is the back pressure more than 3 psi above the nominal running pressure?
Replace the exhaust smoke eliminator filter if necessary
Refer to the appropriate service manual for filter replacement instructions
1 Daily Acoustic Enclosure Maintenance
Acoustic Enclosure Maintenance
Check the collection tank for the build-up of sediment and clean as necessary.
Is the bund tank full?
Drain the bund tank if it is full before further operations.
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













