Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Aerzen Blower GM3S
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Initial 3 Hours Blower Check
Performing checks after commissioning — After the first 3 operating hours
Check that all the parts are in place
Re-tighten screws if necessary after the machine has cooled down
Is the intake pressure valve operating correctly?
Is the oil level correct?
Correct the oil level if necessary
Are the sheaves aligned correctly?
Correct the sheaves alignment if necessary
Is the condition of the belts satisfactory?
Initial 500 Hours Gas-Tight Drive Shaft Grease Lubrication
Preparation
Ensure the machine has a gas-tight shaft seal (optional)
Has the machine operated for 500 hours?
Safety Precautions
Allow housing surfaces to cool to ambient temperature
Wear protective gloves
Grease Pressing Procedure
Press the grease by turning the Stauffer lubricator
Enter the number of turns for the Stauffer lubricator
16000 Hourly / 2 Yearly Sheaves Alignment Check
Maintenance schedule for normal operation
Check the alignment of the sheaves
Check for unusual wear and tear or obvious damage
Check for correct alignment and stability
If necessary, replace the sheaves
Assemble the sheaves
Fit the belt
Initial 25 Hours Blower Post-Maintenance Check
Performing checks after commissioning
Check the oil level
Correct the oil level if necessary
Check the alignment of the sheaves
Correct the alignment of the sheaves if necessary
Checks after maintenance work
Check the oil level
Correct the oil level if necessary
Check the alignment of the sheaves
4000 Hourly / 6 Monthly Lube Oil Change
Preparation
Ensure the equipment has been operating for at least 30 minutes to reach optimal temperature for oil change.
Is the discharge temperature over 140 °C?
Oil Draining Procedure
Follow the full oil draining procedure as described in Initial 500 Hours Lube Oil Change.
Oil Filling Procedure
Follow the full oil filling procedure as described in Initial 500 Hours Lube Oil Change.
Post Maintenance
Verify that there are no oil leaks after the procedure.
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX