

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Aerzen Blower GM120L
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
4000 Hourly / 6 Monthly Belts Inspection
General Instructions
Review relevant chapters
Ensure personnel are service personnel
Check the condition of the belts. Replace if necessary.
Ensure belts are replaced as a set
Version with Lifting Device
Lift the hinged motor support using the hinge jig
Turn guide bushing (pos.3) anti-clockwise using the ratchet wrench
Raise the hinged motor support until the belts are fully relieved of tension
Initial 500 Hours Gas-Tight Drive Shaft Grease Lubrication
Preparation
Ensure the machine has a gas-tight shaft seal (optional)
Has the machine operated for 500 hours?
Safety Precautions
Allow housing surfaces to cool down to ambient temperature to avoid burns
Grease Pressing Procedure
Press the grease by turning the Stauffer lubricator
Record the grease amount and number of turns observed
Turn the Stauffer lubricator one revolution backwards after pressing the required amount of grease
4000 Hourly / 6 Monthly Lube Oil Change
8.2.1 Maintenance schedule for normal operation
Ensure maintenance is scheduled after every 4,000 operational hours or every 6 months.
8.3.5 Changing oil
Is the discharge temperature over 140 °C?
Follow the full oil draining and filling procedure as described in Initial 500 Hours Lube Oil Change.
Personnel
Ensure service personnel are available for the procedure.
Initial 25 Hours Blower Post-Maintenance Check
Performing checks after commissioning
Check and correct oil level if necessary
Check and correct alignment of the sheaves if necessary
Checks after maintenance work
Check and correct oil level if necessary
Check and correct alignment of the sheaves if necessary
16000 Hourly / 2 Yearly Belts Replacement
8.2.1 Maintenance schedule for normal operation
After every 16,000 op. hrs or every 2 years
Belt Replacement Procedure
Refer to the following chapters for detailed instructions
Ensure service personnel are present
Replace the belts
Follow the full belt replacement procedure as described in 4000 Hourly / 6 Monthly Belts Inspection
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













