Aerzen Blower GM120L

Need answers fast?
Explore the manual using AI.

Aerzen Blower GM120L
Aerzen Blower GM120L

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Aerzen Blower GM120L

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Aerzen Blower GM120L

Aerzen Blower GM120L

Create an account to install this asset package.

Maintenance Plans for Aerzen Blower Model GM120L

Integrate maintenance plans directly into your work orders in MaintainX.

4000 Hourly / 6 Monthly Belts Inspection

Check mark

General Instructions

Check mark

Review relevant chapters

Check mark

Ensure personnel are service personnel

Check mark

Check the condition of the belts. Replace if necessary.

Check mark

Ensure belts are replaced as a set

Check mark

Version with Lifting Device

Check mark

Lift the hinged motor support using the hinge jig

Check mark

Turn guide bushing (pos.3) anti-clockwise using the ratchet wrench

Check mark

Raise the hinged motor support until the belts are fully relieved of tension

Run this procedureArrow right

Initial 500 Hours Gas-Tight Drive Shaft Grease Lubrication

Check mark

Preparation

Check mark

Ensure the machine has a gas-tight shaft seal (optional)

Check mark

Has the machine operated for 500 hours?

Check mark

Safety Precautions

Check mark

Allow housing surfaces to cool down to ambient temperature to avoid burns

Check mark

Grease Pressing Procedure

Check mark

Press the grease by turning the Stauffer lubricator

Check mark

Record the grease amount and number of turns observed

Check mark

Turn the Stauffer lubricator one revolution backwards after pressing the required amount of grease

Run this procedureArrow right

4000 Hourly / 6 Monthly Lube Oil Change

Check mark

8.2.1 Maintenance schedule for normal operation

Check mark

Ensure maintenance is scheduled after every 4,000 operational hours or every 6 months.

Check mark

8.3.5 Changing oil

Check mark

Is the discharge temperature over 140 °C?

Check mark

Follow the full oil draining and filling procedure as described in Initial 500 Hours Lube Oil Change.

Check mark

Personnel

Check mark

Ensure service personnel are available for the procedure.

Run this procedureArrow right

Initial 25 Hours Blower Post-Maintenance Check

Check mark

Performing checks after commissioning

Check mark

Check and correct oil level if necessary

Check mark

Check and correct alignment of the sheaves if necessary

Check mark

Checks after maintenance work

Check mark

Check and correct oil level if necessary

Check mark

Check and correct alignment of the sheaves if necessary

Run this procedureArrow right

16000 Hourly / 2 Yearly Belts Replacement

Check mark

8.2.1 Maintenance schedule for normal operation

Check mark

After every 16,000 op. hrs or every 2 years

Check mark

Belt Replacement Procedure

Check mark

Refer to the following chapters for detailed instructions

Check mark

Ensure service personnel are present

Check mark

Replace the belts

Check mark

Follow the full belt replacement procedure as described in 4000 Hourly / 6 Monthly Belts Inspection

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Aerzen

Explore Other Assets