Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Aerzen Blower GM30L
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Initial Oil System Maintenance
Version with Oil System
Check the drain valve for firm seating
Check that the sealing cap of the drain valve is firmly in place
Open the oil container
Ensure that the ventilation pipe in the oil filling container is unobstructed
Fill 3/4 of the listed quantity of oil
Wait 5 - 10 minutes for the lube oil to flow
Check the oil level
Check and adjust the lube oil level on the machine stage's oil level displays
Initial 500 Hours Lube Oil Change
Draining - Version with Oil System
Allow the lube oil to cool down to ambient temperature to avoid scalding risk
Observe the volume of the waste oil and have an oil-resistant receptacle ready
Open the oil opening on the oil filling container to ensure smooth oil flow
Feed the drain hose into the receptacle
Remove the sealing cap from the drain valve and twist the drain hose onto the drain valve
Guide all emerging lube oil into the receptacle to prevent slipping
Remove the drain hose; The drain valve closes automatically
Screw the sealing cap onto the drain valve
16000 Hourly / 2 Yearly Flexible Pipe Connections Check
8.2.1 Maintenance schedule for normal operation
Check flexible pipe connections on the discharge and intake sides for tightness
Replace flexible pipe connections if necessary
Checking intake-side pipelines for tightness
Check pipelines for tightness (visual inspection)
Replace seals or bushing if there are leaks
Reinforce the pipelines if necessary
Disassemble leaking pipe connections
Use new seals or bushing
4000 Hourly / 6 Monthly Belts Inspection
General Instructions
Review relevant chapters
Ensure personnel are service personnel
Check the condition of the belts. Replace if necessary
Ensure belts are replaced as a set
Version with Lifting Device
Lift the hinged motor support using the hinge jig
Turn guide bushing (pos.3) anti-clockwise using the ratchet wrench
Raise the hinged motor support until the belts are fully relieved of tension
8000 Hourly / 12 Monthly Control System Check
8.2.1 Maintenance schedule for normal operation
Check the control system for correct operation
Confirm personnel involvement from Manufacturer's customer service division
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX