

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Aerzen Blower GM16S
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Initial Oil System Maintenance
Version with Oil System
Check that all components are in place
Open the oil container
Ensure the ventilation pipe in the oil filling container is unobstructed
Fill 3/4 of the listed quantity of oil
Wait for 5 - 10 minutes for oil to settle
Check the oil level
Check and adjust the lube oil level on the machine stage's oil level displays
Fill the rest of the lube oil up to the mark on the acoustic hood's sight glass
Initial 25 Hours Blower Post-Maintenance Check
Performing checks after commissioning
Check and correct oil level if necessary
Check and correct alignment of the sheaves if necessary
Checks after maintenance work
Check and correct oil level if necessary
Check and correct alignment of the sheaves if necessary
4000 Hourly / 6 Monthly Lube Oil Change
Maintenance schedule for normal operation
Check operation hours or months since last oil change
Verify discharge temperature
Is the discharge temperature over 140 °C?
Replace the lube oil if temperature is over 140 °C
Follow the full oil draining and filling procedure as described in Initial 500 Hours Lube Oil Change
Personnel involved
4000 Hourly / 6 Monthly Acoustic Hood Openings Inspection
8.2.1 Maintenance schedule for normal operation
Checking the inlet and exhaust air openings on the acoustic hood
Visual inspection of the supply air and exhaust air openings on the acoustic hood
Clean the openings. Remove dirt
Checking fan operation
Check the direction of flow in the operating position with a closed acoustic hood
Is exhaust air extracted from the acoustic hood?
Replace the fan if no exhaust air emerges from the acoustic hood
Replacing the fan
8000 Hourly / 12 Monthly Control System Check
8.2.1 Maintenance schedule for normal operation
Check the control system for correct operation
Confirm personnel involvement from Manufacturer's customer service division
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













