Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Aerzen Blower GM90S
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
8000 Hourly / 12 Monthly Gas-Tight Drive Shaft Grease Lubrication
8.2.1 Maintenance schedule for normal operation
Ensure the machine has operated for 8,000 hours or 12 months
Verify the machine has a gas-tight shaft seal
8.3.4 Replacing the grease on gas-tight drive shafts
Change the grease on the gas-tight shaft seal
Record any issues encountered during the grease replacement
Personnel and Procedure
Ensure service personnel are performing the procedure
Follow the full grease pressing procedure as described in Initial 500 Hours Gas-Tight Drive Shaft Grease Lubrication
16000 Hourly / 2 Yearly Delta Lube 06 Change
Maintenance schedule for normal operation
Check operation hours
Check last oil change date
Determine if oil change is due
Changing oil
Drain old Delta Lube 06 oil
Dispose of old oil properly
Replace with new Delta Lube 06 oil
Check for leaks after filling
Initial 3 Hours Blower Post-Maintenance Check
Performing checks after commissioning
Check intake pressure valve for correct operation
Check oil level and correct if necessary
Re-tighten screws after machine has cooled down
Check and align the sheaves, correct if necessary
Check condition of the belts, change if necessary, establish cause
Check control system, fault transmitter, pressure and temperature sensors for correct operation
Ensure motor overload protection is connected and active
Check for accumulation of preservative oil and remove if necessary
4000 Hourly / 6 Monthly Intake Pressure Valve Check
Movement check for Variation a
Loosen the tensioning seals or the tensioning screws, depending on the silencer design
Remove the silencer cover
Check for correct operation, correct movability and exact alignment of the valve
Can the valve be moved and does it close correctly?
Attach the silencer cover and close it after the test
Movement test for Variation b
Remove the side-mounted sealing screws
Guide screwdrivers through the holes
Initial 3 Hours Blower Check
Performing checks after commissioning — After the first 3 operating hours
Check that all components are in place and functioning
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX