MaintainX Asset Hub logo
EnterprisePricing
Aerzen

Aerzen Blower GM35S

Need answers fast?
Explore the manual using AI.

Aerzen Blower GM35S
Aerzen Blower GM35S

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Aerzen Blower GM35S

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Aerzen Blower GM35S

Aerzen Blower GM35S

Create an account to install this asset package.

Maintenance Plans for Aerzen Blower Model GM35S

Integrate maintenance plans directly into your work orders in MaintainX.

4000 Hourly / 6 Monthly Lube Oil Change

Check mark

Preparation

Check mark

Ensure the equipment has been operating for at least 4,000 hours or 6 months since the last oil change.

Check mark

Is the discharge temperature over 140 °C?

Check mark

Oil Draining and Filling

Check mark

Follow the full oil draining and filling procedure as described in Initial 500 Hours Lube Oil Change.

Check mark

Personnel

Check mark

Ensure service personnel are available for the procedure.

Run this procedureArrow right

4000 Hourly / 6 Monthly Belts Inspection

Check mark

General Instructions

Check mark

Review relevant chapters

Check mark

Ensure personnel are service personnel

Check mark

Check the condition of the belts and replace if necessary

Check mark

Version with Lifting Device

Check mark

Lift the hinged motor support using the hinge jig

Check mark

Turn guide bushing (pos.3) anti-clockwise using the ratchet wrench

Check mark

Raise the hinged motor support until the belts are fully relieved of tension

Check mark

Replace belts as a set

Run this procedureArrow right

Initial 500 Hours Starting Strainer Check

Check mark

Maintenance schedule for normal operation

Check mark

Determine the resistance (pressure loss) of the starting strainer

Check mark

Is the resistance within the maximum limit of 45-50 mbar?

Check mark

Ensure the inside of the pipe is clean

Check mark

Removal and replacement

Check mark

Did the resistance increase during the first 500 operating hours?

Check mark

Is the starting strainer clean?

Check mark

Remove the starting strainer and replace it with the provided adjusting ring

Check mark

Removal and cleaning

Run this procedureArrow right

8000 Hourly / 12 Monthly Lube Oil Change

Check mark

8.2.1 Maintenance schedule for normal operation

Check mark

Maintenance interval

Check mark

Reference Chapter 8.3.5 'Changing oil' on page 150

Check mark

Replace the lube oil

Check mark

Personnel involved

Check mark

Follow the full oil draining and filling procedure as described in Initial 500 Hours Lube Oil Change

Run this procedureArrow right

Initial 3 Hours Blower Check

Check mark

Performing checks after commissioning — After the first 3 operating hours

Check mark

Check that all components are in place and functioning

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Aerzen

Explore Other Assets