PDF MANUAL

Manual for Aerzen Blower GM20L

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Aerzen Blower GM20L

Aerzen Blower GM20L

Create an account to install this asset package.

Maintenance Plans for Aerzen Blower Model GM20L

Integrate maintenance plans directly into your work orders in MaintainX.

Initial 3 Hours Blower Check

Check mark

Performing checks after commissioning — After the first 3 operating hours

Check mark

Re-tighten screws if necessary after the machine has cooled down

Check mark

Check intake pressure valve for correct operation

Check mark

Check oil level and correct if necessary

Check mark

Check and align the sheaves, correct if necessary

Check mark

Check condition of the belts, change if necessary, establish cause

Check mark

Check control system, fault transmitter, pressure and temperature sensors for correct operation

Check mark

Ensure motor overload protection is connected and active

Check mark

Check for accumulation of preservative oil and remove if necessary

Run this procedureArrow right

4000 Hourly / 6 Monthly Acoustic Hood Openings Inspection

Check mark

Checking the inlet and exhaust air openings on the acoustic hood

Check mark

Visual inspection of the supply air and exhaust air openings on the acoustic hood

Check mark

Clean the openings. Remove dirt

Check mark

Checking fan operation

Check mark

Check the direction of flow in the operating position with a closed acoustic hood. Observe the information in the installation drawing

Check mark

Is exhaust air extracted from the acoustic hood?

Check mark

Replacing the fan

Check mark

Open the maintenance elements of the acoustic hood

Check mark

Loosen the screws for attaching the fan

Run this procedureArrow right

16000 Hourly / 2 Yearly Non-Return Flap Inspection

Check mark

Checking the non-return flap

Check mark

Loosen the fastening screws and lightly impact the flange cover to loosen the sealing.

Check mark

Remove the non-return flap from the housing.

Check mark

Carry out a visual inspection of the non-return flap.

Check mark

Is the sealing acceptable?

Check mark

Assembling the non-return flap

Check mark

Remove dirt, grease, and used sealing agent from the flange surface.

Check mark

Apply sealing agent to the flange surface of the housing.

Check mark

Guide the non-return flap into the housing and remove any bleeding sealing agent.

Run this procedureArrow right

8000 Hourly / 12 Monthly Gas-Tight Drive Shaft Grease Lubrication

Check mark

8.2.1 Maintenance schedule for normal operation

Check mark

Verify maintenance schedule

Check mark

Gas-Tight Drive Shaft Grease Replacement

Check mark

Check if the machine has a gas-tight shaft seal (optional)

Check mark

Change the grease on the gas-tight drive shaft

Check mark

Reference Chapter 8.3.4 'Replacing the grease on gas-tight drive shafts' on page 149 for detailed instructions

Check mark

Follow the full grease pressing procedure as described in Initial 500 Hours Gas-Tight Drive Shaft Grease Lubrication

Check mark

Personnel Requirements

Check mark

Ensure service personnel are available for the procedure

Run this procedureArrow right

16000 Hourly / 2 Yearly Flexible Pipe Connections Check

Check mark

Maintenance schedule for normal operation

Check mark

After every 16,000 operational hours or every 2 years

Check mark

Chapter 8.3.16 'Checking pipelines for tightness' on page 166

Check mark

Personnel: Service personnel

Check mark

Check flexible pipe connections for tightness

Check mark

Check flexible pipe connections on the discharge and intake sides for tightness

Check mark

Is replacement of flexible pipe connections necessary?

Check mark

Checking intake-side pipelines for tightness

Check mark

Check pipelines for tightness (visual inspection)

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Aerzen

Explore Other Assets