MaintainX Asset Hub logo
EnterprisePricing
York

York Centrifugal Chiller YKWPWQK75DDGS

Need answers fast?
Explore the manual using AI.

York Centrifugal Chiller YKWPWQK75DDGS
York Centrifugal Chiller YKWPWQK75DDGS

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for York Centrifugal Chiller YKWPWQK75DDGS

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

York Centrifugal Chiller YKWPWQK75DDGS

York Centrifugal Chiller YKWPWQK75DDGS

Create an account to install this asset package.

Maintenance Plans for York Centrifugal Chiller Model YKWPWQK75DDGS

Integrate maintenance plans directly into your work orders in MaintainX.

6 Monthly Chiller Maintenance

Check mark

7.1.5 Every 6 Months (or more often as required)

Check mark

Change and inspect compressor oil filter element

Check mark

Inspect for internal wearing of compressor parts

Check mark

Is the unit shutting down on High Oil Temperature or Low Oil Pressure?

Check mark

Examine oil filter element for aluminum particles

Check mark

Are aluminum particles found in the oil filter?

Check mark

Contact York Service Agent if aluminum particles continue to accumulate

Check mark

Has the variable speed oil pump (VSOP) Drive frequency increased to 55 Hz?

Check mark

Inspect oil filter for aluminum particles indicating possible bearing wear

Run this procedureArrow right

Chiller Tube Leak Testing

Check mark

Tube Leak Detection

Check mark

Remove the heads and listen for hissing sounds indicating gas leakage.

Check mark

Wash off both tube heads and the ends of all tubes with water.

Check mark

Blow out the tubes with nitrogen or dry air to clear traces of refrigerant laden moisture.

Check mark

Pressurize the dry system with nitrogen

Check mark

Cork the tubes for 12 to 24 hours.

Check mark

Test each tube for leaks

Run this procedureArrow right

1 Weekly Refrigerant Charge Check

Check mark

7.1.3 Weekly

Check mark

Check the refrigerant charge (See Refrigerant Charge Checking)

Check mark

7.4.1 Checking The Refrigerant Charge

Check mark

Record the refrigerant level after initial charging

Check mark

Is the refrigerant level visible in the sight glass?

Check mark

Ensure the system is shut down before checking and trimming the refrigerant charge

Check mark

Verify that at least 4 hours have passed since the compressor and water pumps were stopped

Run this procedureArrow right

1 Yearly Compressor Maintenance

Check mark

7.1.6 Annually (more often if necessary)

Check mark

Drain and replace the oil in the compressor oil sump

Check mark

7.3 Oil Charge

Check mark

Verify the nominal oil charge for the compressor is 75.7 litres of York 'K' oil

Check mark

Ensure only York 'K' refrigeration oil is used in the centrifugal compressor

Check mark

Check that the oil is kept tightly capped until used

Check mark

7.3.1 Oil Charging Procedure

Check mark

Shut down the unit

Check mark

Immerse the suction connection of the oil charging pump in a clean container of new oil

Run this procedureArrow right

1 Yearly Heat Exchangers Maintenance

Check mark

7.1.6 Annually (more often if necessary)

Check mark

Inspect and clean components

Check mark

7.5 Condenser and Evaporator

Check mark

Check for common water issues

Check mark

Is the temperature difference between the water off the condenser and the condenser liquid temperature more than 2.2 K greater than the difference recorded on a new unit?

Check mark

Has the temperature difference between the refrigerant and the chilled water increased slowly over the operating season?

Check mark

7.5.1 Chemical Water Treatment

Check mark

Has a chemical analysis of the water been conducted?

Check mark

Is water treatment necessary according to the water treatment expert?

Run this procedureArrow right

Parts for York Centrifugal Chiller YKWPWQK75DDGS

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Heat Conductive Compound

013-00890-000

Oil Charging Pump

070-10654

Heat Conductive Compound

013-00890-000

Oil Charging Pump

070-10654

Heat Conductive Compound

013-00890-000

Oil Charging Pump

070-10654

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from York

Explore Other Assets