York Centrifugal Chiller YKGQEVP85CEGS

Need answers fast?
Explore the manual using AI.

York Centrifugal Chiller YKGQEVP85CEGS
York Centrifugal Chiller YKGQEVP85CEGS

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for York Centrifugal Chiller YKGQEVP85CEGS

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

York Centrifugal Chiller YKGQEVP85CEGS

York Centrifugal Chiller YKGQEVP85CEGS

Create an account to install this asset package.

Maintenance Plans for York Centrifugal Chiller Model YKGQEVP85CEGS

Integrate maintenance plans directly into your work orders in MaintainX.

3 Monthly Chliller Maintenance

Check mark

7.1.4 Every 3 Months

Check mark

Perform chemical analysis of oil

Check mark

Leak test the unit

Check mark

Were any leaks found?

Check mark

Repair any leaks found immediately

Check mark

7.4.2 Leak Testing

Check mark

Charge the system

Check mark

Perform leak test with R134a compatible leak detector

Check mark

Are all joints tight?

Run this procedureArrow right

1 Daily Chiller Operation Check

Check mark

7.1.2 Daily

Check mark

Check graphic control centre (OptiView) displays.

Check mark

Is the compressor in operation?

Check mark

Enter the bearing oil pressure from the SYSTEM Screen.

Check mark

Enter the oil level in the oil reservoir.

Check mark

Is the operating oil level between the upper and lower sight glasses?

Check mark

Drain or add oil if necessary.

Check mark

Enter the entering condenser water pressure and temperature.

Check mark

Enter the leaving condenser water pressure and temperature.

Run this procedureArrow right

Chiller Tube Leak Testing

Check mark

Tube Leak Detection

Check mark

Check for potential leak scenarios

Check mark

Is refrigerant detected at the liquid head vents after shutdown?

Check mark

Has system capacity and efficiency dropped sharply?

Check mark

Immediate Actions for Detected Leaks

Check mark

Valve off evaporator and condenser from the water circuit

Check mark

Drain evaporator and condenser immediately

Check mark

Drain and purge refrigerant system with dry nitrogen

Check mark

Tube Leak Testing Procedure

Run this procedureArrow right

1 Yearly Compressor Maintenance

Check mark

7.1.6 Annually (more often if necessary)

Check mark

Drain and replace the oil in the compressor oil sump

Check mark

7.3 Oil Charge

Check mark

Verify the nominal oil charge for the compressor is 75.7 litres of York "K" oil

Check mark

Ensure only York "K" refrigeration oil is used in the centrifugal compressor

Check mark

Check that the oil is kept tightly capped until used to prevent moisture absorption

Check mark

7.3.1 Oil Charging Procedure

Check mark

Shut down the unit

Check mark

Prepare the oil charging pump and connect to the oil charging valve

Run this procedureArrow right

Chiller Vacuum Testing

Check mark

7.4.3 Vacuum Testing

Check mark

Connect a high capacity vacuum pump to the system charging valve and start the pump

Check mark

Open all system valves

Check mark

Ensure all valves to the atmosphere are closed

Check mark

Operate the vacuum pump until a wet bulb temperature of 0°C or a pressure of 5 mm Hg is reached

Check mark

Circulate warm water through the evaporator and condenser tubes

Check mark

Ensure water temperature does not exceed 50°C

Check mark

Close the system charging valve and the stop valve between the vacuum indicator and the vacuum pump

Check mark

Disconnect the vacuum pump leaving the vacuum indicator in place

Run this procedureArrow right

Parts for York Centrifugal Chiller YKGQEVP85CEGS

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Heat Conductive Compound

013-00890-000

Oil Charging Pump

070-10654

Heat Conductive Compound

013-00890-000

Oil Charging Pump

070-10654

Heat Conductive Compound

013-00890-000

Oil Charging Pump

070-10654

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll