PDF MANUAL

Manual for York Centrifugal Chiller YKEPEPQ55CEGS

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

York Centrifugal Chiller YKEPEPQ55CEGS

York Centrifugal Chiller YKEPEPQ55CEGS

Create an account to install this asset package.

Maintenance Plans for York Centrifugal Chiller Model YKEPEPQ55CEGS

Integrate maintenance plans directly into your work orders in MaintainX.

Chiller Vacuum Testing

Check mark

7.4.3 Vacuum Testing

Check mark

Connect a high capacity vacuum pump with indicator to the system charging valve and start the pump.

Check mark

Open wide all system valves and ensure all valves to the atmosphere are closed.

Check mark

Operate the vacuum pump until a wet bulb temperature of 0°C or a pressure of 5 mm Hg (absolute) is reached.

Check mark

Is warm water (not exceeding 50°C) being circulated through the evaporator and condenser tubes to dehydrate the shells?

Check mark

Close the system charging valve and the stop valve between the vacuum indicator and the vacuum pump, then disconnect the vacuum pump leaving the vacuum indicator in place.

Check mark

Hold the vacuum in the system for 8 hours and check for any rise in pressure.

Check mark

After 8 hours, has the wet bulb temperature in the vacuum indicator remained below 4.4°C or pressure below 6.3 mm Hg?

Check mark

If the vacuum does not hold for 8 hours within the specified limits, was the leak found and repaired?

Run this procedureArrow right

1 Daily Chiller Operation Check

Check mark

7.1.2 Daily

Check mark

Check graphic control centre (OptiView) displays.

Check mark

Check for any signs of dirty or fouled condenser tubes.

Check mark

Compressor Operation Checks

Check mark

Is the compressor in operation?

Check mark

Enter the bearing oil pressure on the SYSTEM Screen.

Check mark

Check the oil level in the oil reservoir.

Check mark

Drain or add oil if necessary.

Check mark

System Screen Checks

Run this procedureArrow right

1 Yearly Chiller Maintenance

Check mark

7.1.6 Annually (more often if necessary)

Check mark

Inspect and service electrical components as necessary

Check mark

7.8 Electrical Controls

Check mark

Inspect all electrical controls for obvious malfunctions

Check mark

Ensure factory settings of controls (operation and safety) are unchanged

Check mark

Perform chemical analysis of system

Run this procedureArrow right

Chiller Tube Leak Testing

Check mark

Tube Leak Detection

Check mark

Check for potential leak scenarios

Check mark

Is refrigerant detected at the liquid head vents after shutdown?

Check mark

Has system capacity and efficiency dropped sharply?

Check mark

Immediate Actions for Detected Leaks

Check mark

Valve off evaporator and condenser from the water circuit and drain immediately

Check mark

Drain and purge the refrigerant system with dry nitrogen

Check mark

Tube Leak Testing Procedure

Check mark

Remove the heads and listen for hissing sounds indicating gas leakage

Run this procedureArrow right

1 Yearly Compressor Maintenance

Check mark

7.1.6 Annually (more often if necessary)

Check mark

Drain and replace the oil in the compressor oil sump

Check mark

7.3 Oil Charge

Check mark

Verify the nominal oil charge for the compressor is 75.7 litres of York 'K' oil

Check mark

Ensure only York 'K' refrigeration oil is used in the centrifugal compressor

Check mark

Check that the oil is kept tightly capped until used to prevent moisture absorption

Check mark

7.3.1 Oil Charging Procedure

Check mark

Shut down the unit

Check mark

Immerse the suction connection of the oil charging pump in a clean container of new oil

Run this procedureArrow right

Parts for York Centrifugal Chiller YKEPEPQ55CEGS

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Heat Conductive Compound

013-00890-000

Oil Charging Pump

070-10654

Heat Conductive Compound

013-00890-000

Oil Charging Pump

070-10654

Heat Conductive Compound

013-00890-000

Oil Charging Pump

070-10654

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from York

Explore Other Assets